Inspection 347154114 OPENED DEC 7, 2023Closed
7528 Midlothian Tpk., Richmond, VA 23225 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Caliber Collision has 4 OSHA inspections on record in Virginia, the first in 2015.
OSHA's last visit started on Dec 7, 2023 as a planned inspection, in Richmond.
Across those inspections OSHA issued 21 citation items: 7 serious and 14 other-than-serious.
OSHA proposed $22,050 in penalties. After settlements and reviews the total is $4,700, down 79%.
Most often, OSHA cited 1910.106, flammable liquids (4 items).
For context, across all repair and personal services employers the median penalty per cited inspection since 2015 is $1,200. Caliber Collision averages $2,350 over 2 cited inspections in that time.
Want to know if OSHA cites Caliber Collision again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this company7528 Midlothian Tpk., Richmond, VA 23225 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
4901 Cleveland Street, Virginia Beach, VA 23462 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
2727 Plantation Road Northeast, Roanoke, VA 24012 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 2, item 1 29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection |
Other-than-serious | $0 | $0 | Dec 2, 2021 | Final |
14150 Willard Rd, Chantilly, VA 20151 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.106(d)(4)(i) · Flammable liquids |
Serious | $3,150 | $1,575 | Jul 8, 2015 | Final |
| Citation 1, item 1b 29 CFR 1910.106(d)(4)(iii) · Flammable liquids |
Serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 1c 29 CFR 1910.106(d)(4)(iv) · Flammable liquids |
Serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 2b 29 CFR 1910.106(e)(9)(iii) · Flammable liquids |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 3a 29 CFR 1910.107(b)(9) · Spray painting and finishing |
Other-than-serious | $2,520 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 3c 29 CFR 1910.107(g)(7) · Spray painting and finishing |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 5 29 CFR 1910.138(b) · Gloves and hand protection |
Other-than-serious | $3,150 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 6 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Other-than-serious | $2,520 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 7 29 CFR 1910.254(d)(9)(iii) · Arc welding and cutting |
Serious | $2,520 | $1,550 | Jul 8, 2015 | Final |
| Citation 1, item 8a 29 CFR 1910.303(b)(2) · Electrical equipment, general requirements |
Other-than-serious | $2,520 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 8b 29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 8c 29 CFR 1910.303(g)(1)(i)(a) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 9a 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Serious | $3,150 | $1,575 | Jul 8, 2015 | Final |
| Citation 1, item 9b 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 9c 29 CFR 1910.305(g)(1)(iv)(c) · Electrical wiring methods |
Serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 10a 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $2,520 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 10b 29 CFR 1910.1200(e)(1)(i) · Hazard communication |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 1, item 10c 29 CFR 1910.1200(g)(8) · Hazard communication |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 2, item 1 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
| Citation 2, item 2 29 CFR 1910.212(b) · Machine guarding |
Other-than-serious | $0 | $0 | Jul 8, 2015 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.106(d)(4)(i)
(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra
29 CFR 1910.106(d)(4)(iii)
(iii) Wiring. Electrical wiring and equipment located in inside storage rooms used for Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be approved under subpart S of this part for Class I, Division 2 Hazardous Locations; for Category 3 flammable liquids with a flashpoint at or above 100 °F (37.8 °C) and Category 4 flammable liquids, shall be approved for general use.
29 CFR 1910.106(d)(4)(iv)
(iv) Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.