OSHA SearchOSHA records by employer

Cape Romain Contractors, Inc.: OSHA inspections and violations

Charleston, South Carolina · Highway, Street, and Bridge Construction · NAICS 237310

10inspections
35citation items
$48,257current penalties
Mar 15, 2017last inspection

Since 1989, OSHA inspectors have visited Cape Romain Contractors, Inc. in South Carolina 10 times.

The most recent inspection opened on Mar 15, 2017, in Mount Pleasant.

In all, OSHA issued 35 citation items: 17 serious and 18 other-than-serious.

The proposed penalties came to $77,626; today they stand at $48,257, 38% less.

The rule cited most here is 1910.134 (respiratory protection), 10 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Cape Romain Contractors, Inc. averages $22,328 across 2 cited inspections.

3 inspections on this page followed a fatal incident.

Cape Romain Contractors, Inc. also files yearly injury logs with OSHA, summarized below.

Cape Romain Contractors, Inc.: OSHA citation items per year, 1989 to 2017
Citation items per year, by inspection date.

South Carolina · latest 90 days of OSHA records

42employers cited

Get notified the morning OSHA posts each new citation in South Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in South Carolina

Checking a subcontractor, a client or your own company? Watch Cape Romain Contractors, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342180700 OPENED MAR 15, 2017Closed

Unprogrammed other · Complete · Safety · 50 employees at the site · Closed Jun 20, 2017

Berth 1 Wando Welch Terminal, Mount Pleasant, SC 29464 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2a
29 CFR 1926.300(b)(2) · Tools—Hand and Power: general requirements
Other-than-serious$6,519$3,260May 19, 2017Final
Citation 1, item 2b
29 CFR 1926.300(b)(5) · Tools—Hand and Power: general requirements
Other-than-serious$0$0May 19, 2017Final
Citation 1, item 3
29 CFR 1926.405(a)(2)(ii)(e) · Job-site wiring
Other-than-serious$6,519$0May 19, 2017Final
Citation 1, item 4a
29 CFR 1926.1437(n)(1)(i) · Floating cranes/derricks and land cranes/derricks on barges
Serious$8,149$8,149May 19, 2017Final
Citation 1, item 4b
29 CFR 1926.1437(n)(5) · Floating cranes/derricks and land cranes/derricks on barges
Serious$0$0May 19, 2017Final
Citation 2, item 1
29 CFR 1926.152(e)(4) · Flammable liquids
Other-than-serious$0$0May 19, 2017Final
Citation 2, item 2
29 CFR 1926.152(g)(9) · Flammable liquids
Other-than-serious$0$0May 19, 2017Final

Inspection 342181187 OPENED MAR 15, 2017Closed

Unprogrammed other · Complete · Health · 50 employees at the site · Closed Jun 5, 2018

Berth 1 Wando Welch Terminal, Mount Pleasant, SC 29464 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1b
29 CFR 1926.55(a) · Gases, vapors, fumes, dusts, and mists
Other-than-serious$0$5,000May 19, 2017Final
Citation 1, item 1c
29 CFR 1926.55(b) · Gases, vapors, fumes, dusts, and mists
Serious$0$0May 19, 2017Final
Citation 1, item 2a
29 CFR 1910.134(c)(3) · Respiratory protection
Serious$8,149$5,000May 19, 2017Final
Citation 1, item 2b
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Serious$0$0May 19, 2017Final
Citation 1, item 2c
29 CFR 1910.134(d)(3)(ii) · Respiratory protection
Serious$0$0May 19, 2017Final
Citation 1, item 3a
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$8,149$5,000May 19, 2017Final
Citation 1, item 3b
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0May 19, 2017Final
Citation 1, item 3c
29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection
Serious$0$0May 19, 2017Final
Citation 1, item 4a
29 CFR 1910.134(h)(1) · Respiratory protection
Other-than-serious$8,149$5,000May 19, 2017Final
Citation 1, item 4b
29 CFR 1910.134(h)(1)(i) · Respiratory protection
Other-than-serious$0$0May 19, 2017Final
Citation 1, item 5
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$8,149$5,000May 19, 2017Final
Citation 1, item 6
29 CFR 1926.50(g) · Medical services and first aid
Other-than-serious$8,149$5,000May 19, 2017Final
Citation 1, item 7
29 CFR 1926.52(d)(1) · Occupational noise exposure
Serious$6,519$3,248May 19, 2017Final
Citation 2, item 1
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Other-than-serious$0$0May 19, 2017Final

Inspection 314083940 OPENED APR 27, 2010Closed

Planned · Complete · Safety · 14 employees at the site · Closed Aug 4, 2010

Hwy 418 At I-385, Fountain Inn, SC 29644 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 30040
Other-than-serious$250$100Jun 9, 2010Closed

Inspection 308326669 OPENED NOV 26, 2007Closed

Unprogrammed related · Complete · Safety · 6 employees at the site · Closed Jan 25, 2008

I-17 Bridge/combahee River, Beaufort, SC 29904 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 300273208 OPENED OCT 4, 2002Closed

Accident · Partial · Safety · 5 employees at the site · Closed Feb 26, 2003

I-26 & Hwy 17-a, Summerville, SC 29483 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Incident on Oct 4, 2002 (fatal): Employee killed when crane boom falls

On October 4, 2002, an old bridge was being dismantled. A new overpass bridge fo r a highway had replaced it. The concrete beams were removed and placed on the g round. The beams were broken into three sections and the sections were placed on to two flatbed trailers for transport to a disposal site. Employees were loading sections of concrete beams onto the flatbeds using a Manitowoc 3900 crawler cra ne equipped with a Number 6 boom. One truck, which had been loaded with two beam sections, departed for the disposal site. Employee #1, the yard foreman, was op erating the second truck. Employee #1 had repositioned his truck to a point wher e the crane could lift the concrete sections and swing the boom to the right, to load the concrete sections on the trailer, using only the hoist line and not ne eding to boom up or down. As the load was being lifted, the boom hoist cable bro ke, causing the boom to fall onto the truck cab where employee #1 was sitting. H e was killed.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 4a
29 CFR 1926.550(a)(1) · [Reserved]
Serious$0$1,400Dec 19, 2002Closed
Citation 1, item 4b
29 CFR 1926.550(a)(2) · [Reserved]
Serious$0$0Dec 19, 2002Closed
Citation 1, item 4c Serious$0$0Dec 19, 2002Closed
Citation 2, item 1
29 CFR 1926.550(a)(6) · [Reserved]
Other-than-serious$0$0Dec 19, 2002Closed
Citation 2, item 2
29 CFR 1926.550(a)(1) · [Reserved]
Other-than-serious$0$0Dec 19, 2002Closed

Inspection 124679978 OPENED NOV 1, 1994Closed

Planned · Partial · Safety · 10 employees at the site · Closed Jan 13, 1995

Artic Ave., Folly Beach, SC 29439 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.106(a) · Working over or near water
Serious$3,000$1,200Nov 23, 1994Closed
Citation 1, item 2
29 CFR 1926.106(d) · Working over or near water
Serious$1,125$450Nov 23, 1994Closed
Citation 1, item 3 Serious$1,125$450Nov 23, 1994Closed

Inspection 120474713 OPENED JAN 13, 1993Closed

Referral · Partial · Health · 10 employees at the site · Closed May 27, 1993

Ashley River Bridge, Charleston, SC 29415 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.132(a) · Personal protective equipment, general requirements
Other-than-serious$1,225$0Feb 10, 1993Final
Citation 1, item 2
29 CFR 1910.134(b)(1) · Respiratory protection
Other-than-serious$1,225$0Feb 10, 1993Final
Citation 1, item 3
29 CFR 1926.21(b)(3) · Construction safety training
Other-than-serious$1,225$0Feb 10, 1993Final
Citation 2, item 1 Other-than-serious$0$0Feb 10, 1993Final
Citation 2, item 2
29 CFR 1926.51(f) · Sanitation
Other-than-serious$0$0Feb 10, 1993Final

Inspection 120474457 OPENED DEC 21, 1992Closed

Referral · No inspection · Health · Closed Dec 30, 1992

Ashley River Bridge, Charleston, SC 29415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

2 older inspections

Inspection 17419623 OPENED SEP 24, 1992Closed

Unprogrammed related · Partial · Safety · 1 employee at the site · Closed Dec 31, 1992

Fbm Alternate Route Bridge, Charleston, SC 29408 · OSHA's record · Phone and website on Google Maps

Incident on Sep 23, 1992 (fatal): Employee drowns after jumping from rocking boat

Employees who normally performed concrete work were working on a spud barge that was spudded with two spuds on one side to pull dolphins/pilings out of the chan nel. The employees were using a crawler crane and a 7/8 in. sling to pull out th e dolphins/pilings. When the crew attempted to pull out the third piling, the sl ing broke, causing the barge to rock in the water. Employee #1 and two coworkers who had rigged the piling were in a skiff that was next to the barge and that a lso began to rock. Employee #1 became frightened and jumped into the water. The tide was going out and the current pulled him under the barge. His body was foun d 1 1/2 miles downstream 2 days later. According to the coroner's report, Employ ee #1 drowned. He and his coworkers were not wearing life preservers.

No citations from this inspection.

Inspection 17420761 OPENED OCT 26, 1989Closed

Accident · Partial · Health · 27 employees at the site · Closed Nov 1, 1989

State Hwy 33, Wando, SC 29492 · OSHA's record · Phone and website on Google Maps

Incident on Sep 9, 1988 (fatal): Employee drowned due to fall from barge

Employee #1 and another employee were working on a dredging barge moored in a ha rbor on a rainy day. After refueling the barge crane around 9:30 a.m., Employee #1 took a break to get out of the rain while the other employee operated the cra ne. During his break, Employee #1 fell from the barge into the water and drowned . At approximately 11:15 am, two employees noticed Employee #1 missing and began to look for him. They found his body approximately 20 ft from the barge in 7-ft deep water.

No citations from this inspection.

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Wando site logged 4 recordable injuries or illnesses among about 75 workers: 6.2 per 100 full-time workers, against a median of 0.0 for its industry. Those cases cost 44 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Cape Romain Contractors, Inc.
Wando · 2025
75 416.20.0
Cape Romain Contractors
Wando · 2024
75 627.20.0

Included with any plan: 7 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(f)(6)(ii)

(ii) Product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals, and which, in conjunction with the other information immediately available to employees under the hazard communication program, will provide employees with the specific information regarding the physical and health hazards of the hazardous chemical.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(a)

(a) Application. Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(b)(1)

(1) Normal breathing. In a normal standing position, without talking, the subject shall breathe normally for 1 minute. After the normal breathing exercise, the subject needs to hold head straight ahead and hold his or her breath for 10 seconds during the test measurement.

29 CFR 1910.20

29 CFR 1926.106 · Working over or near water

29 CFR 1926.1437 · Floating cranes/derricks and land cranes/derricks on barges

29 CFR 1926.152 · Flammable liquids

29 CFR 1926.21 · Construction safety training

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.51 · Sanitation

29 CFR 1926.52 · Occupational noise exposure

29 CFR 1926.55 · Gases, vapors, fumes, dusts, and mists

29 CFR 1926.550 · [Reserved]

Other highway, street, and bridge construction employers in South Carolina

Alert subscribers get notified of each newly cited employer in South Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.