OSHA SearchOSHA records by employer

Central Illinois Truss, Inc.: OSHA inspections and violations

Deer Creek, Illinois · Truss Manufacturing · NAICS 321214

2inspections
11citation items
$7,350current penalties
May 5, 2016last inspection

OSHA has inspected Central Illinois Truss, Inc. 2 times in Illinois since 2008.

The latest one began on May 5, 2016 as part of a related case, in Deer Creek.

Those inspections ended with 11 citation items: 11 serious.

Penalties were first proposed at $11,450 and now stand at $7,350, 36% lower after settlements or reviews.

Lockout/tagout comes up most often in these citations: 4 items under 1910.147.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Central Illinois Truss, Inc. averages $850 (1 cited inspection).

Central Illinois Truss, Inc.: OSHA citation items per year, 2008 to 2016
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

428employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Central Illinois Truss, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341451029 OPENED MAY 5, 2016Closed

Unprogrammed related · Partial · Safety · 14 employees at the site · Closed Jan 11, 2017

105 Prospect Dr., Deer Creek, IL 61733 · Truss Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.213(h)(4) · Woodworking machinery
Serious$1,700$850Jun 29, 2016Final

Inspection 310803978 OPENED NOV 12, 2008Closed

Referral · Partial · Safety · 25 employees at the site · Closed Nov 3, 2009

105 Prospect Dr., Deer Creek, IL 61733 · Truss Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Nov 10, 2008: Employee's leg is amputated when caught in machine rollers

At approximately 3:00 p.m. on November 10, 2008, Employee #1 was assisting cowor kers in using a MII RoofGlider machine to build wood truss rafters. The RoofGlid er measures 14 feet wide and has a roller that presses metal plates onto precut boards to form wood rafters. Operators of the machine are positioned at one end of the roller to operate the controls, while boards are laid on a series of tabl es and temporarily held together with metal plates that are hammered into place by the workers. Workers are expected to walk in between the tables to gain acces s to the trusses for positioning the boards and setting the metal plates. As Emp loyee #1 was walking between the tables to move a board, the roller approached h im. Employee #1 knew that he would not be able to get out of the way in time and pushed the emergency-stop push bar. Depression of this emergency-stop bar shoul d have stopped the roller from advancing; however, the roller did not stop. Empl oyee #1's left leg became pinned against one of the tables. Employee #1 called f or help. The coworker operating the machine reversed the roller in an attempt to free Employee #1's leg. But this caused his leg to become further tangled in th e wheels of the roller. Employee #1 was hospitalized, where his leg was amputate d.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements
Serious$1,250$1,000Dec 4, 2008Closed
Citation 1, item 1b
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Serious$0$0Dec 4, 2008Closed
Citation 1, item 1c
29 CFR 1910.132(f)(1) · Personal protective equipment, general requirements
Serious$0$0Dec 4, 2008Closed
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$1,250$1,000Dec 4, 2008Closed
Citation 1, item 3
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$1,250$1,000Dec 4, 2008Closed
Citation 1, item 4
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$1,250$1,000Dec 4, 2008Closed
Citation 1, item 5
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$1,250$1,000Dec 4, 2008Closed
Citation 1, item 6a
29 CFR 1910.178(l)(1)(i) · Forklifts and other powered industrial trucks
Serious$1,000$500Dec 4, 2008Closed
Citation 1, item 6b
29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks
Serious$0$0Dec 4, 2008Closed
Citation 1, item 7
29 CFR 1910.212(a)(1) · Machine guarding
Serious$2,500$1,000Dec 4, 2008Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(d)(1)

(d) Hazard assessment and equipment selection. (1) The employer shall assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE). If such hazards are present, or likely to be present, the employer shall:

29 CFR 1910.132(d)(2)

(2) The employer shall verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment.

29 CFR 1910.132(f)(1)

(f) Training. (1) The employer shall provide training to each employee who is required by this section to use PPE. Each such employee shall be trained to know at least the following:

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.213 · Woodworking machinery

Other truss manufacturing employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.