OSHA SearchOSHA records by employer

Certco, Inc.: OSHA inspections and violations

Madison, Wisconsin · General Line Grocery Merchant Wholesalers · NAICS 424410

10inspections
26citation items
$28,857current penalties
Jul 22, 2021last inspection

Since 1991, OSHA inspectors have visited Certco, Inc. in Wisconsin 10 times.

The most recent inspection opened on Jul 22, 2021 on a referral, in Madison.

In all, OSHA issued 26 citation items: 16 serious and 10 other-than-serious.

The proposed penalties came to $35,578; today they stand at $28,857, 19% less.

The rule cited most here is 1910.119 (process safety management), 6 times.

Among wholesale employers, the typical cited inspection since 2015 ends with a $3,425 penalty. Certco, Inc. averages $5,852 across 1 cited inspection.

Certco, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 2 severe injuries to OSHA since 2015.

The Wage and Hour Division has 1 case on it since 2015, with $0 in back wages owed to workers.

Certco, Inc.: OSHA citation items per year, 1991 to 2021
Citation items per year, by inspection date.

Want to know if OSHA cites Certco, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345433585 OPENED JUL 22, 2021Closed

Referral · Partial · Safety · 69 employees at the site · Closed Oct 25, 2021

2730 Daniels Street, Madison, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Incident on Jul 15, 2021: Employee sustains leg fractures after collision with stopped

At 9:00 a.m. on July 15, 2021, Employee #1, a Janitor, was operating a stand-up power pallet jack in aisle CB with a load behind him. A coworker, a Forklift Operator, was stopped at a cut-through from aisle CA to CB with forklift forks in the aisle. Employee #1 struck the coworker's stopped forklift, resulting in fractures to Employee 1's right lower leg and contusions to the left leg. The employee was hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(n)(4) · Forklifts and other powered industrial trucks
Serious$9,753$5,852Sep 24, 2021Final

Inspection 340134204 OPENED DEC 11, 2014Closed

Planned · No inspection · Health · 150 employees at the site · Closed Dec 29, 2014

5321 Verona Road, Fitchburg, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 313137267 OPENED FEB 9, 2011Closed

Complaint · Partial · Safety · 300 employees at the site · Closed Feb 17, 2011

5321 Verona Road, Madison, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 313134462 OPENED JUL 22, 2010Closed

Referral · Partial · Safety · 225 employees at the site · Closed Sep 22, 2010

5321 Verona Road, Madison, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.120(q)(1) · Hazardous waste operations and emergency response
Serious$5,000$3,500Aug 23, 2010Closed

Inspection 310766613 OPENED JUN 16, 2008Closed

Planned · Complete · Safety · 300 employees at the site · Closed Jan 21, 2009

5321 Verona Road, Madison, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.119(d)(2)(i) · Process safety management
Serious$2,250$2,250Sep 16, 2008Closed
Citation 1, item 2
29 CFR 1910.119(d)(3)(i) · Process safety management
Serious$2,250$2,250Sep 16, 2008Closed
Citation 1, item 3
29 CFR 1910.119(e)(1) · Process safety management
Serious$2,250$2,250Sep 16, 2008Closed
Citation 1, item 4
29 CFR 1910.119(f)(1)(id) · Process safety management
Serious$2,250$2,250Sep 16, 2008Closed
Citation 1, item 5
29 CFR 1910.119(j)(2) · Process safety management
Serious$2,250$2,250Sep 16, 2008Closed
Citation 1, item 6
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$2,250$2,250Sep 16, 2008Closed
Citation 2, item 1
29 CFR 1910.151(c) · First aid and eyewash
Other-than-serious$0$0Sep 16, 2008Closed

Inspection 310763305 OPENED AUG 29, 2007Closed

Complaint · Partial · Safety · 300 employees at the site · Closed Aug 30, 2007

5321 Verona Road, Madison, WI 53711 · Other Grocery and Related Products Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 308381151 OPENED JUL 15, 2005Closed

Programmed other · No inspection · Safety · 200 employees at the site · Closed Jul 20, 2005

5321 Verona Road, Madison, WI 53711 · General Line Grocery Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 306112913 OPENED SEP 13, 2004Closed

Complaint · Partial · Safety · 200 employees at the site · Closed Sep 21, 2004

5321 Verona Road, Madison, WI 53711 · Other Grocery and Related Products Merchant Wholesalers · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

2 older inspections

Inspection 303865307 OPENED DEC 13, 2001Closed

Planned · Complete · Safety · 165 employees at the site · Closed Feb 4, 2002

5321 Verona Road, Madison, WI 53711 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.36(b)(4) · Exit route design
Serious$1,100$770Jan 7, 2002Closed
Citation 1, item 2
29 CFR 1910.120(q)(2)(i) · Hazardous waste operations and emergency response
Serious$825$578Jan 7, 2002Closed
Citation 1, item 3
29 CFR 1910.120(q)(2)(iii) · Hazardous waste operations and emergency response
Serious$825$578Jan 7, 2002Closed
Citation 1, item 4
29 CFR 1910.215(b)(9) · Grinders and abrasive wheels
Serious$825$578Jan 7, 2002Closed
Citation 1, item 5
29 CFR 1910.242(b) · Hand and power tools
Serious$825$578Jan 7, 2002Closed
Citation 2, item 1
29 CFR 1910.37(j) · Exit routes
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 2
29 CFR 1910.119(h)(2)(iii) · Process safety management
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 3
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 4
29 CFR 1910.134(c)(1)(iii) · Respiratory protection
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 5
29 CFR 1910.134(l)(2)(ii) · Respiratory protection
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 6
29 CFR 1910.134(m)(2)(ii) · Respiratory protection
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 7
29 CFR 1910.134(m)(3) · Respiratory protection
Other-than-serious$0$0Jan 7, 2002Closed
Citation 2, item 8
29 CFR 1910.178(l)(3)(ig) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Jan 7, 2002Closed

Inspection 102511383 OPENED JUN 6, 1991Closed

Complaint · Partial · Safety · 120 employees at the site · Closed Jul 26, 1991

6150 Mckee Road, Madison, WI 53719 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$1,575$1,575Jun 20, 1991Closed
Citation 1, item 1b
29 CFR 1910.178(m)(12)(i) · Forklifts and other powered industrial trucks
Serious$0$0Jun 20, 1991Closed
Citation 1, item 2
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$900$900Jun 20, 1991Closed
Citation 2, item 1
29 CFR 1904.2(a) · Partial exemption for establishments in certain industries
Other-than-serious$450$450Jun 20, 1991Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Fitchburg site logged 17 recordable injuries or illnesses among about 323 workers: 5.2 per 100 full-time workers, against a median of 4.6 for its industry. Those cases cost 99 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Certco Inc
Fitchburg · 2025
323 1785.24.6
Certco Inc Verona Road
Fitchburg · 2022
500 722.04.6
Certco Inc Femrite
Madison · 2022
247 1458.64.6
Certco, inc. Daniels Street
Madison · 2022
122 506.44.6
Verona
Madison · 2021
308 2386.94.6
Femrite
Madison · 2021
136 19713.24.6
Daniels
Madison · 2021
74 638.04.6
Location #1
Fitchburg · 2018
298 1685.24.6

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Oct 3, 2025, Fitchburg: Hospitalization · fractures · hip joint(s)

At 7:40 a.m. on October 3, 2025, an employee was unloading a bulkhead at a dock door. As he pulled the bulkhead out of a trailer, its plastic lip caught on the dock plate, causing the employee to fall and twist his left leg, knee, and hip. The hip was broken and he was hospitalized, requiring surgery.

Jul 15, 2021, Madison: Hospitalization · fractures · leg(s), unspecified

On 7/15/2021 at 9:00 a.m., an employee was traveling down a warehouse aisle on an electric pallet jack when a forklift struck the pallet jack at an aisle intersection. The employee was pinned to the pallet jack by the palletized materials on the forklift, resulting in leg fractures that required surgery.

Wage and hour cases

Cases by the Labor Department's Wage and Hour Division since 2015: unpaid minimum wage or overtime, child labor, family leave and more.

Period reviewedViolationsWorkers owedBack wagesPenalties
Aug 19, 2020 to Oct 2, 2020
Madison
20$0$0

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.2 · Partial exemption for establishments in certain industries

29 CFR 1910.119 · Process safety management

29 CFR 1910.119(d)(2)(i)

(2) Information pertaining to the technology of the process. (i) Information concerning the technology of the process shall include at least the following:

29 CFR 1910.119(d)(3)(i)

(3) Information pertaining to the equipment in the process. (i) Information pertaining to the equipment in the process shall include:

29 CFR 1910.119(e)(1)

(e) Process hazard analysis. (1) The employer shall perform an initial process hazard analysis (hazard evaluation) on processes covered by this standard. The process hazard analysis shall be appropriate to the complexity of the process and shall identify, evaluate, and control the hazards involved in the process. Employers shall determine and document the priority order for conducting process hazard analyses based on a rationale which includes such considerations as extent of the process hazards, number of potentially affected employees, age of the process, and operating history of the process. The process hazard analysis shall be conducted as soon as possible, but not later than the following schedule:

29 CFR 1910.120 · Hazardous waste operations and emergency response

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.36 · Exit route design

29 CFR 1910.37 · Exit routes

Other general line grocery merchant wholesalers employers in Wisconsin

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.