OSHA SearchOSHA records by employer

Chelu Jung Construction Corporation: OSHA inspections and violations

Mangilao, Guam · All Other Specialty Trade Contractors · NAICS 238990

4inspections
6citation items
$3,740current penalties
Feb 10, 2015last inspection

Since 2011, OSHA inspectors have visited Chelu Jung Construction Corporation in Guam 4 times.

The most recent inspection opened on Feb 10, 2015 as a planned inspection, in Yigo.

In all, OSHA issued 6 citation items: 3 serious and 3 other-than-serious.

The penalties, $3,740 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Chelu Jung Construction Corporation averages $2,380 across 1 cited inspection.

Chelu Jung Construction Corporation: OSHA citation items per year, 2011 to 2015
Citation items per year, by inspection date.

Guam · latest 90 days of OSHA records

6employers cited

Get notified the morning OSHA posts each new citation in Guam: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Guam

Checking a subcontractor, a client or your own company? Watch Chelu Jung Construction Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340327477 OPENED FEB 10, 2015Closed

Planned · Complete · Safety · 11 employees at the site · Closed Jun 4, 2015

Chalan Flores, Yigo, GU 96929 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$1,020$1,020Mar 17, 2015Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$1,360$1,360Mar 17, 2015Final
Citation 2, item 1
29 CFR 1926.703(a)(2) · Requirements for cast-in-place concrete
Other-than-serious$0$0Mar 17, 2015Final

Inspection 339090441 OPENED MAY 31, 2013Closed

Planned · Partial · Safety · 5 employees at the site · Closed Sep 4, 2015

Sumay Memorial Dr. Track# 125, Lot# 2new, Santa Rita, GU 96915 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,360$1,360Jun 28, 2013Final

Inspection 331081133 OPENED OCT 26, 2011Closed

Follow-up · Partial · Safety · 2 employees at the site · Closed Oct 26, 2011

Lot 2333-2-2new, Mangilao, GU 96913 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 315176412 OPENED FEB 9, 2011Closed

Planned · Complete · Safety · 2 employees at the site · Closed Dec 5, 2011

Lot 2323-2-2new, Mangilao, GU 96913 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(e) · Electrical equipment on job sites
Other-than-serious$0$0Apr 5, 2011Closed
Citation 1, item 2
29 CFR 1926.405(a)(2)(iii) · Job-site wiring
Other-than-serious$0$0Apr 5, 2011Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(iii)

(iii) Guarding. For temporary wiring over 600 volts, nominal, fencing, barriers, or other effective means shall be provided to prevent access of other than authorized and qualified personnel.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.703 · Requirements for cast-in-place concrete

Other all other specialty trade contractors employers in Guam

Alert subscribers get notified of each newly cited employer in Guam the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.