OSHA SearchOSHA records by employer

Clancy Custom Woodworking, LLC: OSHA inspections and violations

Knoxville, Tennessee · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

1inspections
16citation items
$3,200current penalties
Sep 28, 2018last inspection

OSHA inspectors have visited Clancy Custom Woodworking, LLC in Tennessee one time.

It opened on Sep 28, 2018 as a planned inspection, in Knoxville.

In all, OSHA issued 16 citation items: 12 serious and 4 other-than-serious.

The penalties, $3,200 in total, stand where OSHA first set them.

The rule cited most here is 1910.134 (respiratory protection), 7 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Clancy Custom Woodworking, LLC averages $3,200 across 1 cited inspection.

Clancy Custom Woodworking, LLC: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

342employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Clancy Custom Woodworking, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343503066 OPENED SEP 28, 2018Closed

Planned · Complete · Health · 21 employees at the site · Closed Feb 8, 2019

3239 Nw Park Dr, Knoxville, TN 37921 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Serious$500$500Nov 21, 2018Final
Citation 1, item 2a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$700$700Nov 21, 2018Final
Citation 1, item 2b
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Nov 21, 2018Final
Citation 1, item 3
29 CFR 1910.133(a)(2) · Eye and face protection
Serious$600$600Nov 21, 2018Final
Citation 1, item 4a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$700$700Nov 21, 2018Final
Citation 1, item 4b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 4c
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 4d
29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 4e
29 CFR 1910.134(g)(1)(iii) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 4f
29 CFR 1910.134(k)(3) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 4g
29 CFR 1910.134(k)(6) · Respiratory protection
Serious$0$0Nov 21, 2018Final
Citation 1, item 5
29 CFR 1910.242(b) · Hand and power tools
Serious$600$600Nov 21, 2018Final
Citation 2, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$100$100Nov 21, 2018Final
Citation 2, item 1b
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Other-than-serious$0$0Nov 21, 2018Final
Citation 2, item 1c
29 CFR 1910.1200(g)(8) · Hazard communication
Other-than-serious$0$0Nov 21, 2018Final
Citation 2, item 1d
29 CFR 1910.1200(h)(1) · Hazard communication
Other-than-serious$0$0Nov 21, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.133 · Eye and face protection

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.242 · Hand and power tools

Other wood kitchen cabinet and countertop manufacturing employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.