OSHA SearchOSHA records by employer

Claudio Rodriguez: OSHA inspections and violations

Plano, Texas · Masonry Contractors · NAICS 238140

1inspections
3citation items
$1,680current penalties
Mar 25, 2015last inspection

Claudio Rodriguez has one OSHA inspection on record in Texas.

OSHA opened it on Mar 25, 2015 as a planned inspection, in Plano.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA proposed $8,400 in penalties. After settlements and reviews the total is $1,680, down 80%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,079. Claudio Rodriguez averages $1,680 over 1 cited inspection in that time.

Claudio Rodriguez: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Want to know if OSHA cites Claudio Rodriguez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 340494426 OPENED MAR 25, 2015Closed

Planned · Partial · Safety · 3 employees at the site · Closed Aug 6, 2018

4605 Spalding St., Plano, TX 75024 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$2,800$560Aug 31, 2015Final
Citation 1, item 2
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,800$560Aug 31, 2015Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,800$560Aug 31, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.