Inspection 346198047 OPENED SEP 6, 2022Closed
526 West Main, Jackson, MO 63755 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Scott City, Missouri · All Other Specialty Trade Contractors · NAICS 238990
OSHA has inspected Coast to Coast Signs 2 times in Missouri since 2017.
The latest one began on Sep 6, 2022 on a referral, in Jackson.
Those inspections ended with 18 citation items: 15 serious and 3 other-than-serious.
Penalties were first proposed at $5,976 and now stand at $1,800, 70% lower after settlements or reviews.
Wire rope—inspection comes up most often in these citations: 6 items under 1926.1413.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Coast to Coast Signs averages $1,800 (1 cited inspection).
Missouri · latest 90 days of OSHA records
124employers cited
Get notified the morning OSHA posts each new citation in Missouri: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Missouri
Checking a subcontractor, a client or your own company? Watch Coast to Coast Signs and get notified the morning OSHA posts a new citation for it.
Watch this company526 West Main, Jackson, MO 63755 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
3180 East Outer Road North, Scott City, MO 63780 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.453(b)(2)(v) · Aerial lifts |
Serious | $1,630 | $600 | May 12, 2017 | Final |
| Citation 1, item 1b 29 CFR 1926.503(a)(2)(iii) · Fall protection training in construction |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 1c 29 CFR 1926.503(b)(1) · Fall protection training in construction |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 2a 29 CFR 1926.1412(d)(1) · Inspections |
Serious | $1,630 | $600 | May 12, 2017 | Final |
| Citation 1, item 2b 29 CFR 1926.1412(d)(2) · Inspections |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 2c 29 CFR 1926.1412(e)(2) · Inspections |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 2d 29 CFR 1926.1412(e)(3) · Inspections |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 2e 29 CFR 1926.1412(f)(2) · Inspections |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 2f 29 CFR 1926.1412(f)(7) · Inspections |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 3a 29 CFR 1926.1413(a)(1) · Wire rope—inspection |
Serious | $2,716 | $600 | May 12, 2017 | Final |
| Citation 1, item 3b 29 CFR 1926.1413(a)(4)(ii)(b) · Wire rope—inspection |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 3c 29 CFR 1926.1413(b)(1) · Wire rope—inspection |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 3d 29 CFR 1926.1413(b)(4) · Wire rope—inspection |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 3e 29 CFR 1926.1413(c)(1) · Wire rope—inspection |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 1, item 3f 29 CFR 1926.1413(c)(4) · Wire rope—inspection |
Serious | $0 | $0 | May 12, 2017 | Final |
| Citation 2, item 1 29 CFR 1926.20(b)(3) · Construction safety programs |
Other-than-serious | $0 | $0 | May 12, 2017 | Final |
| Citation 2, item 2a 29 CFR 1926.150(a)(2) · Fire protection |
Other-than-serious | $0 | $0 | May 12, 2017 | Final |
| Citation 2, item 2b 29 CFR 1926.150(a)(4) · Fire protection |
Other-than-serious | $0 | $0 | May 12, 2017 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.1412(d)(1)
(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:
29 CFR 1926.1412(d)(2)
(2) If any deficiency in paragraphs (d)(1)(i) through (xiii) of this section (or in additional inspection items required to be checked for specific types of equipment in accordance with other sections of this standard) is identified, an immediate determination must be made by the competent person as to whether the deficiency constitutes a safety hazard. If the deficiency is determined to constitute a safety hazard, the equipment must be taken out of service until it has been corrected. See § 1926.1417.
29 CFR 1926.1412(e)(2)
(2) Equipment must not be used until an inspection under this paragraph demonstrates that no corrective action under paragraphs (d)(2) and (3) of this section is required.
Alert subscribers get notified of each newly cited employer in Missouri the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.