OSHA SearchOSHA records by employer

Collision Professionals: OSHA inspections and violations

Wayne, Michigan · Automotive Body, Paint, and Interior Repair and Maintenance · NAICS 811121

2inspections
9citation items
$2,080current penalties
Sep 29, 2017last inspection

OSHA has inspected Collision Professionals 2 times in Michigan since 2016.

The latest one began on Sep 29, 2017 to follow up on an earlier case, in Wayne.

Those inspections ended with 9 citation items: 7 serious and 2 other-than-serious.

Penalties were first proposed at $5,200 and now stand at $2,080, 60% lower after settlements or reviews.

Flammable liquids comes up most often in these citations: 4 items under 1910.106.

How that compares: the median penalty per cited inspection for repair and personal services employers since 2015 is $1,200, and Collision Professionals averages $1,040 (2 cited inspections).

Collision Professionals: OSHA citation items per year, 2016 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Collision Professionals again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342669934 OPENED SEP 29, 2017Closed

Follow-up · Partial · Health · 3 employees at the site · Closed Aug 6, 2018

32444 Michigan Avenue, Wayne, MI 48184 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Nov 8, 2017Final
Citation 1, item 2
29 CFR 1910.134(c)(2)(ii) · Respiratory protection
Other-than-serious$0$0Nov 8, 2017Final

Inspection 340035757 OPENED JUN 17, 2016Closed

Programmed related · Partial · Safety · 4 employees at the site · Closed Nov 22, 2019

32444 Michigan Ave, Wayne, MI 48184 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10015(6)
Serious$800$320Aug 19, 2016Final
Citation 1, item 2
29 CFR 408.10241
Serious$800$320Aug 19, 2016Final
Citation 1, item 3a
29 CFR 1910.106(d)(4)(i) · Flammable liquids
Serious$1,000$400Aug 19, 2016Final
Citation 1, item 3b
29 CFR 1910.106(d)(4)(i) · Flammable liquids
Serious$0$0Aug 19, 2016Final
Citation 1, item 4
29 CFR 1910.106(d)(4)(iii) · Flammable liquids
Serious$1,000$400Aug 19, 2016Final
Citation 1, item 5
29 CFR 1910.106(d)(4)(iv) · Flammable liquids
Serious$800$320Aug 19, 2016Final
Citation 1, item 6
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$800$320Aug 19, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(4)(i)

(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra

29 CFR 1910.106(d)(4)(iii)

(iii) Wiring. Electrical wiring and equipment located in inside storage rooms used for Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall be approved under subpart S of this part for Class I, Division 2 Hazardous Locations; for Category 3 flammable liquids with a flashpoint at or above 100 °F (37.8 °C) and Category 4 flammable liquids, shall be approved for general use.

29 CFR 1910.106(d)(4)(iv)

(iv) Ventilation. Every inside storage room shall be provided with either a gravity or a mechanical exhaust ventilation system. Such system shall be designed to provide for a complete change of air within the room at least six times per hour. If a mechanical exhaust system is used, it shall be controlled by a switch located outside of the door. The ventilating equipment and any lighting fixtures shall be operated by the same switch. A pilot light shall be installed adjacent to the switch if Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), are dispensed within the room. Where gravity ventilation is provided, the fresh air intake, as well as the exhaust outlet from the room, shall be on the exterior of the building in which the room is located.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

Other automotive body, paint, and interior repair and maintenance employers in Michigan

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.