OSHA SearchOSHA records by employer

Critical Path Metalworks, Inc.: OSHA inspections and violations

Westcliffe, Colorado · Fabricated Structural Metal Manufacturing · NAICS 332312

2inspections
3citation items
$540current penalties
Nov 13, 2018last inspection

Critical Path Metalworks, Inc. has 2 OSHA inspections on record in Colorado, the first in 2016.

OSHA's last visit started on Nov 13, 2018 as a planned inspection, in Westcliffe.

Across those inspections OSHA issued 3 citation items: 3 other-than-serious.

OSHA proposed $900 in penalties. After settlements and reviews the total is $540, down 40%.

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Critical Path Metalworks, Inc. averages $540 over 1 cited inspection in that time.

Critical Path Metalworks, Inc.: OSHA citation items per year, 2016 to 2018
Citation items per year, by inspection date.

Colorado · latest 90 days of OSHA records

142employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Colorado: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Colorado

Checking a subcontractor, a client or your own company? Watch Critical Path Metalworks, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343577730 OPENED NOV 13, 2018Closed

Planned · No inspection · Safety · Closed Nov 13, 2018

614 Cliff St., Westcliffe, CO 81252 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341592020 OPENED JUN 30, 2016Closed

Planned · Complete · Safety · 15 employees at the site · Closed Sep 26, 2016

614 Cliff St., Westcliffe, CO 81252 · Fabricated Structural Metal Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Other-than-serious$300$180Aug 29, 2016Final
Citation 1, item 2
29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks
Other-than-serious$300$180Aug 29, 2016Final
Citation 1, item 3
29 CFR 1910.1200(g)(8) · Hazard communication
Other-than-serious$300$180Aug 29, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(g)(8)

(8) The employer shall maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and shall ensure that they are readily accessible during each work shift to employees when they are in their work area(s). (Electronic access and other alternatives to maintaining paper copies of the safety data sheets are permitted as long as no barriers to immediate employee access in each workplace are created by such options.)

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(h)(2)(i)

(i) All respirators shall be stored to protect them from damage, contamination, dust, sunlight, extreme temperatures, excessive moisture, and damaging chemicals, and they shall be packed or stored to prevent deformation of the facepiece and exhalation valve.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.178(q)(7)

(7) Industrial trucks shall be examined before being placed in service, and shall not be placed in service if the examination shows any condition adversely affecting the safety of the vehicle. Such examination shall be made at least daily.

Other fabricated structural metal manufacturing employers in Colorado

Alert subscribers get notified of each newly cited employer in Colorado the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.