Inspection 342073012 OPENED JAN 26, 2017Closed
500 Territorial Dr., Bolingbrook, IL 60440 · Forging and Stamping · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Bolingbrook, Illinois · Forging and Stamping · NAICS 332116
D&D Manufacturing, Inc. has 4 OSHA inspections on record in Illinois, the first in 1999.
OSHA's last visit started on Jan 26, 2017 to follow up on an earlier case, in Bolingbrook.
Across those inspections OSHA issued 28 citation items: 15 serious, 9 repeat and 4 other-than-serious.
OSHA proposed $117,110 in penalties. After settlements and reviews the total is $79,896, down 32%.
Most often, OSHA cited 1910.217, mechanical power presses (8 items).
For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. D&D Manufacturing, Inc. averages $74,996 over 1 cited inspection in that time.
It reported 1 severe injury to OSHA since 2015.
Illinois · latest 90 days of OSHA records
428employers cited
Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Illinois
Checking a subcontractor, a client or your own company? Watch D&D Manufacturing, Inc. and get notified the morning OSHA posts a new citation for it.
Watch this company500 Territorial Dr., Bolingbrook, IL 60440 · Forging and Stamping · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
500 Territorial Dr., Bolingbrook, IL 60440 · Metal Crown, Closure, and Other Metal Stamping (except Automotive) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.217(c)(3)(vii)(a) · Mechanical power presses |
Serious | $6,930 | $6,930 | Dec 9, 2015 | Final |
| Citation 2, item 1 29 CFR 1904.29(b)(1) · Injury and illness log |
Other-than-serious | $1,000 | $1,000 | Dec 9, 2015 | Final |
| Citation 2, item 2 29 CFR 1904.39(a)(2) · Reporting deaths and severe injuries |
Other-than-serious | $1,000 | $1,000 | Dec 9, 2015 | Final |
| Citation 3, item 1 29 CFR 1910.147(c)(5)(i) · Lockout/tagout |
Serious | $6,930 | $4,504 | Mar 30, 2016 | Final |
| Citation 3, item 2a 29 CFR 1910.217(d)(9)(i) · Mechanical power presses |
Serious | $6,930 | $4,504 | Mar 30, 2016 | Final |
| Citation 3, item 2b 29 CFR 1910.217(d)(9)(iv) · Mechanical power presses |
Serious | $0 | $0 | Mar 30, 2016 | Final |
| Citation 3, item 3 29 CFR 1910.303(b)(7)(iv) · Electrical equipment, general requirements |
Serious | $4,950 | $3,217 | Mar 30, 2016 | Final |
| Citation 3, item 4 29 CFR 1910.303(f)(2) · Electrical equipment, general requirements |
Serious | $4,950 | $3,217 | Mar 30, 2016 | Final |
| Citation 3, item 5 29 CFR 1910.305(b)(1)(i) · Electrical wiring methods |
Serious | $3,960 | $2,574 | Mar 30, 2016 | Final |
| Citation 4, item 1 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Repeat | $13,860 | $9,240 | Mar 30, 2016 | Final |
| Citation 4, item 2 29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout |
Repeat | $13,860 | $9,009 | Mar 30, 2016 | Final |
| Citation 4, item 3 29 CFR 1910.217(b)(7)(iii) · Mechanical power presses |
Repeat | $9,900 | $6,435 | Mar 30, 2016 | Final |
| Citation 4, item 4a 29 CFR 1910.217(c)(1)(i) · Mechanical power presses |
Repeat | $13,860 | $9,009 | Mar 30, 2016 | Final |
| Citation 4, item 4b 29 CFR 1910.217(c)(3)(iii)(f) · Mechanical power presses |
Repeat | $0 | $0 | Mar 30, 2016 | Final |
| Citation 4, item 5 29 CFR 1910.217(c)(3)(iii)(c) · Mechanical power presses |
Repeat | $13,860 | $9,009 | Mar 30, 2016 | Final |
| Citation 4, item 6a 29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts |
Repeat | $7,920 | $5,148 | Mar 30, 2016 | Final |
| Citation 4, item 6b 29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts |
Repeat | $0 | $0 | Mar 30, 2016 | Final |
| Citation 4, item 7 29 CFR 1910.253(b)(2)(ii) · Gas welding and cutting |
Repeat | $200 | $200 | Mar 30, 2016 | Final |
| Citation 5, item 1 29 CFR 1910.147(c)(5)(ii) · Lockout/tagout |
Other-than-serious | $0 | $0 | Mar 30, 2016 | Final |
| Citation 5, item 2 29 CFR 1910.255(e) · Resistance welding |
Other-than-serious | $0 | $0 | Mar 30, 2016 | Final |
500 Territorial Dr., Bolingbrook, IL 60440 · Forging and Stamping · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $1,400 | $980 | Dec 30, 2003 | Closed |
| Citation 1, item 2a 29 CFR 1910.178(l)(6) · Forklifts and other powered industrial trucks |
Serious | $1,400 | $980 | Dec 30, 2003 | Closed |
| Citation 1, item 2b 29 CFR 1910.178(p)(1) · Forklifts and other powered industrial trucks |
Serious | $0 | $0 | Dec 30, 2003 | Closed |
| Citation 1, item 2c 29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks |
Serious | $0 | $0 | Dec 30, 2003 | Closed |
| Citation 1, item 3 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $1,400 | $980 | Dec 30, 2003 | Closed |
| Citation 1, item 4 29 CFR 1910.217(c)(2)(ia) · Mechanical power presses |
Serious | $1,400 | $980 | Dec 30, 2003 | Closed |
| Citation 1, item 5a 29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts |
Serious | $1,400 | $980 | Dec 30, 2003 | Closed |
| Citation 1, item 5b 29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts |
Serious | $0 | $0 | Dec 30, 2003 | Closed |
500 Territorial Dr., Bolingbrook, IL 60440 · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Feb 2, 2016, Bolingbrook: Hospitalization · soreness, pain, hurt-nonspecified injury · lower extremities, unspecified
A 2,200-pound, 6-inch-wide steel coil fell over onto an employee's leg.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1904.29(b)(1)
(b) Implementation—(1) What do I need to do to complete the OSHA 300 Log? You must enter information about your business at the top of the OSHA 300 Log, enter a one or two line description for each recordable injury or illness, and summarize this information on the OSHA 300-A at the end of the year.
29 CFR 1904.39(a)(2)
(2) Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, you must report the in-patient hospitalization, amputation, or loss of an eye to OSHA.
29 CFR 1910.147(c)(1)
(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.
Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.