Columbus, Indiana · Ornamental and Architectural Metal Work Manufacturing · NAICS 332323

5inspections
11citation items
$1,168current penalties
Feb 14, 2019last inspection

Davids Incorporated has 5 OSHA inspections on record in Indiana, the first in 1997.

OSHA's last visit started on Feb 14, 2019 after a complaint, in Columbus.

Across those inspections OSHA issued 11 citation items: 9 serious and 2 other-than-serious.

OSHA proposed $2,125 in penalties. After settlements and reviews the total is $1,168, down 45%.

Most often, OSHA cited 1910.134, respiratory protection (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Davids Incorporated averages $650 over 1 cited inspection in that time.

Davids Incorporated: OSHA citation items per year, 1997 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Davids Incorporated again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 343887873 OPENED FEB 14, 2019Closed

Complaint · Partial · Health · 11 employees at the site · Closed Apr 8, 2019

905 South Gladstone Avenue, Columbus, IN 47201 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$1,000$650Mar 28, 2019Final

Inspection 312657398 OPENED MAR 2, 2009Closed

Planned · Complete · Health · 14 employees at the site · Closed Sep 4, 2009

905 South Gladstone Avenue, Columbus, IN 47201 · Ornamental and Architectural Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$225$146Mar 17, 2009Closed
Citation 1, item 1b
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Mar 17, 2009Closed
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$225$146Mar 17, 2009Closed
Citation 1, item 2b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Mar 17, 2009Closed
Citation 1, item 2c
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Mar 17, 2009Closed
Citation 1, item 2d
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$0$0Mar 17, 2009Closed

Inspection 127427060 OPENED FEB 15, 2000Closed

Planned · No inspection · Safety · Closed Feb 25, 2000

905 South Gladstone Avenue, Columbus, IN 47201 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125402552 OPENED JUN 18, 1997Closed

Referral · Partial · Health · 20 employees at the site · Closed Oct 2, 1997

905 South Gladstone Avenue, Columbus, IN 47201 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125347542 OPENED APR 7, 1997Closed

Planned · Complete · Safety · 15 employees at the site · Closed May 29, 1997

2150 Southeastern Avenue, Columbus, IN 47201 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$300$225Apr 22, 1997Closed
Citation 1, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$375$0Apr 22, 1997Closed
Citation 2, item 1
29 CFR 1910.253(b)(4)(i) · Gas welding and cutting
Other-than-serious$0$0Apr 22, 1997Closed
Citation 2, item 2
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0Apr 22, 1997Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.212 · Machine guarding

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.303 · Electrical equipment, general requirements

Other ornamental and architectural metal work manufacturing employers in Indiana