OSHA SearchOSHA records by employer

Dream Systems LLC: OSHA inspections and violations

Weston, Wisconsin · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210

1inspections
2citation items
$910current penalties
Sep 4, 2015last inspection

OSHA inspectors have visited Dream Systems LLC in Wisconsin one time.

It opened on Sep 4, 2015 after a complaint, in Weston.

In all, OSHA issued 2 citation items: 1 serious and 1 other-than-serious.

The proposed penalties came to $2,040; today they stand at $910, 55% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Dream Systems LLC averages $910 across 1 cited inspection.

Dream Systems LLC: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

232employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Dream Systems LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340898535 OPENED SEP 4, 2015Closed

Complaint · Partial · Safety · 11 employees at the site · Closed Feb 18, 2016

5108 E. Jelinek Ave., Weston, WI 54476 · Electrical Contractors and Other Wiring Installation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(1) · General requirements
Serious$1,020$510Dec 10, 2015Final
Citation 1, item 2
29 CFR 1910.304(b)(3)(ii)(c) · Grounding and circuit protection
Other-than-serious$1,020$400Dec 10, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.22 · General requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(b)(3)(ii)(c)

(C) Where the ground-fault circuit-interrupter protection required by paragraph (b)(3)(ii)(B) of this section is not available for receptacles other than 125-volt, single-phase, 15-, 20-, and 30-ampere, the employer shall establish and implement an assured equipment grounding conductor program covering cord sets, receptacles that are not a part of the building or structure, and equipment connected by cord and plug that are available for use or used by employees on those receptacles. This program shall comply with the following requirements:

Other electrical contractors and other wiring installation contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.