OSHA SearchOSHA records by employer

DRY Coolers Inc: OSHA inspections and violations

Oxford, Michigan · Power Boiler and Heat Exchanger Manufacturing · NAICS 332410

5inspections
32citation items
$7,900current penalties
Feb 24, 2025last inspection

DRY Coolers Inc has 5 OSHA inspections on record in Michigan, the first in 2008.

OSHA's last visit started on Feb 24, 2025 as part of a related case, in Oxford.

Across those inspections OSHA issued 32 citation items: 15 serious, 1 repeat and 16 other-than-serious.

OSHA proposed $15,800 in penalties. After settlements and reviews the total is $7,900, down 50%.

Most often, OSHA cited 1910.147, lockout/tagout (3 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. DRY Coolers Inc averages $3,175 over 2 cited inspections in that time.

DRY Coolers Inc also files yearly injury logs with OSHA, summarized below.

DRY Coolers Inc: OSHA citation items per year, 2008 to 2025
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

647employers cited

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch DRY Coolers Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348057746 OPENED FEB 24, 2025Closed

Unprogrammed related · Partial · Health · 61 employees at the site · Closed May 2, 2025

575 South Glaspie Street, Oxford, MI 48371 · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 325.47201(3)
Other-than-serious$0$0Apr 2, 2025Final
Citation 1, item 2a
29 CFR 1910.1026(d)(2)(i) · Hexavalent chromium
Other-than-serious$0$0Apr 2, 2025Final
Citation 1, item 2b
29 CFR 1910.1026(l)(1)(iii) · Hexavalent chromium
Other-than-serious$0$0Apr 2, 2025Final
Citation 1, item 3
29 CFR 408.22129(1)
Other-than-serious$0$0Apr 2, 2025Final

Inspection 348035700 OPENED FEB 11, 2025Closed

Planned · Complete · Safety · 58 employees at the site · Closed Mar 28, 2025

575 South Glaspie Street, Oxford, MI 48371 · Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.12176(1)
Serious$1,600$800Feb 28, 2025Final
Citation 1, item 2
29 CFR 408.12635(1)
Serious$2,000$1,000Feb 28, 2025Final
Citation 1, item 3
29 CFR 408.13308(1)
Serious$3,000$1,500Feb 28, 2025Final
Citation 1, item 4
29 CFR 408.13370(1)
Serious$1,600$800Feb 28, 2025Final
Citation 1, item 5
29 CFR 408.15836(1)
Serious$2,000$1,000Feb 28, 2025Final
Citation 1, item 6a
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$2,000$1,000Feb 28, 2025Final
Citation 1, item 6b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0Feb 28, 2025Final
Citation 1, item 6c
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$0$0Feb 28, 2025Final
Citation 2, item 1
29 CFR 408.12131(1)
Other-than-serious$0$0Feb 28, 2025Final
Citation 2, item 2
29 CFR 408.22141(1)
Other-than-serious$500$250Feb 28, 2025Final

Inspection 315387894 OPENED JAN 17, 2012Closed

Planned · Complete · Safety · 40 employees at the site · Closed Apr 30, 2012

575 S Glaspie St, Oxford, MI 48371 · Power Boiler and Heat Exchanger Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(e)(6)(ii) · Flammable liquids
Serious$600$300Feb 17, 2012Closed
Citation 2, item 1 Other-than-serious$0$0Feb 17, 2012Closed
Citation 2, item 2 Other-than-serious$0$0Feb 17, 2012Closed
Citation 2, item 3 Other-than-serious$0$0Feb 17, 2012Closed
Citation 3, item 1 Repeat$100$50Feb 17, 2012Closed

Inspection 311986616 OPENED JAN 8, 2009Closed

Unprogrammed related · Partial · Health · 26 employees at the site · Closed May 26, 2009

3232 Adventure Ln, Oxford, MI 48371 · Power Boiler and Heat Exchanger Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$450$225Apr 16, 2009Closed

Inspection 308818947 OPENED DEC 9, 2008Closed

Planned · Complete · Safety · 26 employees at the site · Closed Jun 5, 2009

3232 Adventure Ln, Oxford, MI 48371 · Power Boiler and Heat Exchanger Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$450$225Feb 26, 2009Closed
Citation 1, item 2 Serious$450$225Feb 26, 2009Closed
Citation 1, item 3 Serious$600$300Feb 26, 2009Closed
Citation 1, item 4
29 CFR 1910.107(c)(6) · Spray painting and finishing
Serious$450$225Feb 26, 2009Closed
Citation 2, item 1 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 2 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 3 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 4 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 5 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 6 Other-than-serious$0$0Feb 26, 2009Closed
Citation 2, item 7
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$0$0Feb 26, 2009Closed
Citation 3, item 1
29 CFR 1910.134(c)(1) · Respiratory protection
Other-than-serious$0$0Apr 16, 2009Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Oxford site logged 5 recordable injuries or illnesses among about 58 workers: 9.1 per 100 full-time workers, against a median of 2.4 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Dry Coolers Inc
Oxford · 2025
58 509.12.4
Dry Coolers Inc.
Oxford · 2024
57 101.82.8

Included with any plan: 2 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1026 · Hexavalent chromium

29 CFR 1910.1026(d)(2)(i)

(2) Scheduled monitoring option. (i) The employer shall perform initial monitoring to determine the 8-hour TWA exposure for each employee on the basis of a sufficient number of personal breathing zone air samples to accurately characterize full shift exposure on each shift, for each job classification, in each work area. Where an employer does representative sampling instead of sampling all employees in order to meet this requirement, the employer shall sample the employee(s) expected to have the highest chromium (VI) exposures.

29 CFR 1910.1026(l)(1)(iii)

(l) Communication of chromium (VI) hazards to employees—(1) Hazard communication—general—(i) Chemical manufacturers, importers, distributors and employers shall comply with all requirements of the Hazard Communication Standard (HCS) (§ 1910.1200) for chromium (VI).

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(e)(6)(ii)

(ii) Grounding. Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), shall not be dispensed into containers unless the nozzle and container are electrically interconnected. Where the metallic floorplate on which the container stands while filling is electrically connected to the fill stem or where the fill stem is bonded to the container during filling operations by means of a bond wire, the provisions of this section shall be deemed to have been complied with.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 3256.107

29 CFR 4081.1211

29 CFR 4081.1222

29 CFR 4081.1223

29 CFR 4081.123

29 CFR 4081.187

29 CFR 4081.213

29 CFR 4081.2154

29 CFR 4081.2176

29 CFR 4081.3308

29 CFR 4081.34

29 CFR 4081.4004

29 CFR 4081.645

Other power boiler and heat exchanger manufacturing employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.