OSHA SearchOSHA records by employer

Eagle Management Co LLC: OSHA inspections and violations

Lawrence, Massachusetts · Wood Kitchen Cabinet and Countertop Manufacturing · NAICS 337110

2inspections
15citation items
$16,500current penalties
Nov 12, 2024last inspection

Since 2024, OSHA inspectors have visited Eagle Management Co LLC in Massachusetts 2 times.

The most recent inspection opened on Nov 12, 2024 after a complaint, in Lawrence.

In all, OSHA issued 15 citation items: 11 serious and 4 other-than-serious.

The proposed penalties came to $51,313; today they stand at $16,500, 68% less.

The rule cited most here is 1910.107 (spray painting and finishing), 6 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Eagle Management Co LLC averages $8,250 across 2 cited inspections.

Eagle Management Co LLC: OSHA citation items per year, 2024 to 2024
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

247employers cited

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch Eagle Management Co LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347872301 OPENED NOV 12, 2024Closed

Complaint · Partial · Safety · 42 employees at the site · Closed Dec 19, 2025

678 Andover Street Suite 1, Lawrence, MA 01843 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.22(a)(1) · Walking-working surfaces
Serious$8,276$4,000Mar 4, 2025Final
Citation 1, item 2
29 CFR 1910.213(c)(1) · Woodworking machinery
Serious$11,585$4,000Mar 4, 2025Final
Citation 1, item 3
29 CFR 1910.303(b)(7)(i) · Electrical equipment, general requirements
Serious$11,585$2,000Mar 4, 2025Final

Inspection 347872749 OPENED NOV 12, 2024Closed

Complaint · Partial · Health · 30 employees at the site · Closed Aug 28, 2025

678 Andover Street, Lawrence, MA 01843 · Wood Kitchen Cabinet and Countertop Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$5,627$900Apr 22, 2025Final
Citation 1, item 2
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$4,220$1,800Apr 22, 2025Final
Citation 1, item 3a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$4,220$1,800Apr 22, 2025Final
Citation 1, item 3b
29 CFR 1910.107(f)(3) · Spray painting and finishing
Serious$0$0Apr 22, 2025Final
Citation 1, item 3c
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$0$0Apr 22, 2025Final
Citation 1, item 3d
29 CFR 1910.107(g)(3) · Spray painting and finishing
Serious$0$0Apr 22, 2025Final
Citation 1, item 4a
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$4,220$1,500Apr 22, 2025Final
Citation 1, item 4b
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Apr 22, 2025Final
Citation 2, item 1
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$790$250Apr 22, 2025Final
Citation 2, item 2a
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Other-than-serious$790$250Apr 22, 2025Final
Citation 2, item 2b
29 CFR 1910.134(c)(1) · Respiratory protection
Other-than-serious$0$0Apr 22, 2025Final
Citation 2, item 2c
29 CFR 1910.134(k) · Respiratory protection
Other-than-serious$0$0Apr 22, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(f)(3)

(3) Cleaning of heads. Sprinklers protecting spraying areas shall be kept as free from deposits as practical by cleaning daily if necessary. (See also paragraph (g) of this section.)

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.22 · Walking-working surfaces

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.95 · Noise

Other wood kitchen cabinet and countertop manufacturing employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.