Epic Metals Corporation: OSHA inspections and violations

Rankin, Pennsylvania · Sheet Metal Work Manufacturing · NAICS 332322

10inspections
51citation items
$15,600current penalties
Oct 3, 2024last inspection

Epic Metals Corporation has 10 OSHA inspections on record in Pennsylvania, the first in 1976.

OSHA's last visit started on Oct 3, 2024 as a planned inspection, in Rankin.

Across those inspections OSHA issued 51 citation items: 29 serious and 22 other-than-serious.

OSHA proposed $22,560 in penalties. After settlements and reviews the total is $15,600, down 31%.

Most often, OSHA cited 1910.305, electrical wiring methods (5 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Epic Metals Corporation averages $10,920 over 1 cited inspection in that time.

Epic Metals Corporation also files yearly injury logs with OSHA, summarized below.

Epic Metals Corporation: OSHA citation items per year, 1976 to 2024
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

285employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Epic Metals Corporation and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347792111 OPENED OCT 3, 2024Closed

Planned · No inspection · Health · 50 employees at the site · Closed Oct 4, 2024

11 Talbot Avenue, Rankin, PA 15104 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341487163 OPENED MAY 18, 2016Closed

Planned · Complete · Safety · 75 employees at the site · Closed Dec 2, 2016

11 Talbot Avenue, Rankin, PA 15104 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.24(b) · Fixed industrial stairs
Serious$2,800$2,200Jul 27, 2016Final
Citation 1, item 2b
29 CFR 1910.138(a) · Gloves and hand protection
Serious$0$0Jul 27, 2016Final
Citation 1, item 3a
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$3,500$2,625Jul 27, 2016Final
Citation 1, item 3b
29 CFR 1910.147(c)(7)(iv) · Lockout/tagout
Serious$0$0Jul 27, 2016Final
Citation 1, item 4a
29 CFR 1910.212(a)(1) · Machine guarding
Serious$3,500$2,100Jul 27, 2016Final
Citation 1, item 4b
29 CFR 1910.212(a)(5) · Machine guarding
Other-than-serious$0$0Jul 27, 2016Final
Citation 1, item 4c
29 CFR 1910.219(c)(2)(i) · Belts, pulleys and power-transmission parts
Serious$0$0Jul 27, 2016Final
Citation 1, item 5a
29 CFR 1910.217(c)(2)(i)(b) · Mechanical power presses
Serious$3,500$2,100Jul 27, 2016Final
Citation 1, item 5b
29 CFR 1910.217(c)(3)(iii)(e) · Mechanical power presses
Other-than-serious$0$0Jul 27, 2016Final
Citation 1, item 5c
29 CFR 1910.217(e)(3) · Mechanical power presses
Other-than-serious$0$0Jul 27, 2016Final
Citation 1, item 6a
29 CFR 1910.303(b)(7) · Electrical equipment, general requirements
Serious$2,100$1,895Jul 27, 2016Final
Citation 1, item 6b
29 CFR 1910.303(f)(1) · Electrical equipment, general requirements
Serious$0$0Jul 27, 2016Final
Citation 1, item 6c
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$0$0Jul 27, 2016Final
Citation 1, item 6d
29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods
Serious$0$0Jul 27, 2016Final
Citation 1, item 6e
29 CFR 1910.305(j)(4)(v) · Electrical wiring methods
Serious$0$0Jul 27, 2016Final
Citation 2, item 1
29 CFR 1910.23(a)(8)(ii) · Guarding floor and wall openings and holes
Other-than-serious$0$0Jul 27, 2016Final
Citation 2, item 2 Other-than-serious$0$0Jul 27, 2016Final
Citation 2, item 3
29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts
Other-than-serious$0$0Jul 27, 2016Final
Citation 2, item 4
29 CFR 1910.255(b)(5) · Resistance welding
Other-than-serious$0$0Jul 27, 2016Final

Inspection 333885234 OPENED APR 11, 2012Closed

Planned · Complete · Health · 29 employees at the site · Closed Jul 31, 2012

11 Talbot Avenue, Rankin, PA 15104 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(c)(2)(ii) · Respiratory protection
Serious$2,100$1,050Jun 22, 2012Final
Citation 2, item 1
29 CFR 1910.134(c)(2)(i) · Respiratory protection
Other-than-serious$0$0Jun 22, 2012Final

Inspection 310294491 OPENED OCT 4, 2007Closed

Planned · Partial · Health · 100 employees at the site · Closed Nov 6, 2007

11 Talbot Avenue, Braddock, PA 15104 · Ornamental and Architectural Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(3) · Spray painting and finishing
Serious$700$490Oct 30, 2007Closed
Citation 1, item 1b
29 CFR 1910.107(e)(5) · Spray painting and finishing
Serious$0$0Oct 30, 2007Closed
Citation 2, item 1
29 CFR 1910.107(g)(7) · Spray painting and finishing
Other-than-serious$0$0Oct 30, 2007Closed

Inspection 306957051 OPENED NOV 6, 2003Closed

Planned · No inspection · Safety · 80 employees at the site · Closed Nov 6, 2003

11 Talbot Avenue, Braddock, PA 15104 · Sheet Metal Work Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 123311730 OPENED DEC 2, 1998Closed

Planned · Complete · Safety · 70 employees at the site · Closed Jan 19, 1999

11 Talbot Avenue, Braddock, PA 15104 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$525$525Dec 9, 1998Closed
Citation 1, item 1b
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$0$0Dec 9, 1998Closed
Citation 1, item 2
29 CFR 1910.212(a)(1) · Machine guarding
Serious$525$525Dec 9, 1998Closed
Citation 1, item 3a
29 CFR 1910.213(h)(1) · Woodworking machinery
Serious$525$525Dec 9, 1998Closed
Citation 1, item 3b
29 CFR 1910.213(h)(4) · Woodworking machinery
Serious$0$0Dec 9, 1998Closed
Citation 2, item 1
29 CFR 1910.217(e)(1)(i) · Mechanical power presses
Other-than-serious$0$0Dec 9, 1998Closed
Citation 2, item 2
29 CFR 1910.1200(h) · Hazard communication
Other-than-serious$0$0Dec 9, 1998Closed
Citation 2, item 3
29 CFR 1910.1200(f)(5)(i) · Hazard communication
Other-than-serious$0$0Dec 9, 1998Closed
Citation 2, item 4
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Dec 9, 1998Closed
Citation 2, item 5
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Other-than-serious$0$0Dec 9, 1998Closed

Inspection 749267 OPENED NOV 4, 1988Closed

Planned · Complete · Safety · 66 employees at the site · Closed Dec 9, 1988

11 Talbot Avenue, Braddock, PA 15104 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$240$240Nov 23, 1988Closed
Citation 1, item 2
29 CFR 1910.219(e)(3)(i) · Belts, pulleys and power-transmission parts
Serious$240$240Nov 23, 1988Closed
Citation 2, item 1
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0Nov 23, 1988Closed

Inspection 879148 OPENED MAR 13, 1985Closed

Planned · Complete · Safety · 61 employees at the site · Closed Aug 15, 1985

11 Talbot Avenue, Rankin, PA 15104 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.176(b) · Material storage and aisles
Serious$350$180Mar 25, 1985Closed
Citation 1, item 2
29 CFR 1910.213(h)(1) · Woodworking machinery
Serious$210$110Mar 25, 1985Closed
Citation 1, item 3
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Other-than-serious$210$0Mar 25, 1985Closed
Citation 1, item 4
29 CFR 1910.306(b)(1)(iia) · Specific purpose equipment and installations
Serious$350$180Mar 25, 1985Closed
Citation 2, item 1
29 CFR 1910.101(b) · Compressed gases (general requirements)
Other-than-serious$0$0Mar 25, 1985Closed
Citation 2, item 2
29 CFR 1910.304(f)(5)(v) · Grounding and circuit protection
Other-than-serious$0$0Mar 25, 1985Closed
Citation 2, item 3
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Mar 25, 1985Closed
2 older inspections

Inspection 12990230 OPENED DEC 3, 1981Closed

Planned · Complete · Safety · 138 employees at the site · Closed Feb 18, 1983

11 Talbot Ave, Rankin, PA 15104 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$420$210Dec 31, 1981Closed
Citation 1, item 2
29 CFR 1910.213(h)(3) · Woodworking machinery
Serious$300$150Dec 31, 1981Closed
Citation 1, item 3
29 CFR 1910.219(d)(1) · Belts, pulleys and power-transmission parts
Serious$180$90Dec 31, 1981Closed
Citation 1, item 4
29 CFR 1910.217(d)(9)(iv) · Mechanical power presses
Serious$240$120Dec 31, 1981Closed
Citation 2, item 1
29 CFR 1910.179(k)(2) · Overhead and gantry cranes
Other-than-serious$0$0Dec 10, 1981Closed

Inspection 12922829 OPENED FEB 19, 1976Closed

Planned · Complete · Safety · 175 employees at the site · Closed Mar 12, 1976

11 Talbot Avenue, Rankin, PA 15104 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.213(h)(4) · Woodworking machinery
Other-than-serious$45$45Feb 25, 1976Closed
Citation 1, item 2
29 CFR 1910.252(e)(2)(iii) · Welding fire safety
Other-than-serious$0$0Feb 25, 1976Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2024, the Rankin site logged 3 recordable injuries or illnesses among about 114 workers: 2.9 per 100 full-time workers, against a median of 3.6 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Epic Metals Corporation
Rankin · 2024
114 302.93.6

Included with any plan: 6 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(3)

(3) Floors. The floor surface of a spray booth and operator's working area, if combustible, shall be covered with noncombustible material of such character as to facilitate the safe cleaning and removal of residues.

29 CFR 1910.107(e)(5)

(5) Spraying containers. Containers supplying spray nozzles shall be of closed type or provided with metal covers kept closed. Containers not resting on floors shall be on metal supports or suspended by wire cables. Containers supplying spray nozzles by gravity flow shall not exceed 10 gallons capacity. Original shipping containers shall not be subject to air pressure for supplying spray nozzles. Containers under air pressure supplying spray nozzles shall be of limited capacity, not exceeding that necessary for 1 day's operation; shall be designed and approved for such use; shall be provided with a visible pressure gage; and shall be provided with a relief valve set to operate in conformance with the requirements of the Code for Unfired Pressure Vessels, Section VIII of the ASME Boiler and Pressure Vessel Code—1968, which is incorporated by reference as specified in § 1910.6. Containers

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.138 · Gloves and hand protection

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.176 · Material storage and aisles

29 CFR 1910.179 · Overhead and gantry cranes

29 CFR 1910.184 · Slings

29 CFR 1910.212 · Machine guarding

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.217 · Mechanical power presses

29 CFR 1910.219 · Belts, pulleys and power-transmission parts

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.24 · Fixed industrial stairs

29 CFR 1910.252 · Welding fire safety

29 CFR 1910.253 · Gas welding and cutting

29 CFR 1910.255 · Resistance welding

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.306 · Specific purpose equipment and installations

Other sheet metal work manufacturing employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.