OSHA SearchOSHA records by employer

Final Site LLC: OSHA inspections and violations

Palm Bay, Florida · Site Preparation Contractors · NAICS 238910

2inspections
5citation items
$30,665current penalties
Feb 12, 2026last inspection

Since 2025, OSHA inspectors have visited Final Site LLC in Florida 2 times.

The most recent inspection opened on Feb 12, 2026 as part of a related case, in Maitland.

In all, OSHA issued 5 citation items: 3 serious and 2 repeat.

The proposed penalties came to $60,762; today they stand at $30,665, 50% less.

The rule cited most here is 1926.651 (excavations), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Final Site LLC averages $15,332 across 2 cited inspections.

Final Site LLC: OSHA citation items per year, 2025 to 2026
Citation items per year, by inspection date.

Want to know if OSHA cites Final Site LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348745746 OPENED FEB 12, 2026Closed

Unprogrammed related · Partial · Safety · 47 employees at the site · Closed Jun 15, 2026

161 Marion Way, Maitland, FL 32751 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(c)(2) · Excavations
Serious$11,585$5,792Apr 17, 2026Final
Citation 2, item 1
29 CFR 1926.651(j)(2) · Excavations
Repeat$23,170$11,585Apr 17, 2026Final
Citation 2, item 2
29 CFR 1926.652(a)(1) · Trench protection
Repeat$23,170$11,585Apr 17, 2026Final

Inspection 348419755 OPENED AUG 5, 2025Closed

Planned · Partial · Safety · 5 employees at the site · Closed Sep 17, 2025

110 St. Johns Pkwy, Palm Bay, FL 32907 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.651(j)(2) · Excavations
Serious$2,837$1,702Aug 20, 2025Final
Citation 1, item 1b
29 CFR 1926.652(a)(1) · Trench protection
Serious$0$0Aug 20, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.651(j)(2)

(2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.

29 CFR 1926.652 · Trench protection

29 CFR 1926.652(a)(1)

(a) Protection of employees in excavations. (1) Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when:

Other site preparation contractors employers in Florida

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.