First Solar, Inc.: OSHA inspections and violations
Perrysburg, Ohio · Semiconductor and Related Device Manufacturing · NAICS 334413
6inspections
5citation items
$29,351current penalties
Oct 13, 2025last inspection
OSHA has inspected First Solar, Inc. 6 times in Ohio since 2011.
The latest one began on Oct 13, 2025 after a fatality or catastrophe, in Perrysburg.
Those inspections ended with 5 citation items: 5 serious.
Penalties were first proposed at $48,518 and now stand at $29,351, 40% lower after settlements or reviews.
Lockout/tagout comes up most often in these citations: 2 items under 1910.147.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and First Solar, Inc. averages $8,990 (3 cited inspections).
1 inspection on this page followed a fatal incident.
First Solar, Inc. also files yearly injury logs with OSHA, summarized below.
It reported 3 severe injuries to OSHA since 2015.
Citation items per year, by inspection date.
Ohio · latest 90 days of OSHA records
275employers cited
Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.
Incident on Oct 13, 2015 (fatal): Employee falls from ladder while changing light bulb and lat
At 12:00 p.m. on October 13, 2015, an employee was working at line B of the acid etch in Unit #2, changing an overhead inspection light bulb approximately 8.5 feet above the ground using a 4-foot Werner fiberglass step ladder. The employee was descending the ladder to retrieve a dropped bolt when the employee lost his balance from the second step of the ladder which was approximately 23 inches above the floor. In an attempt to correct his balance, the employee stepped off the second step to the floor, and ruptured the patella tendon of the right knee. There were no direct witnesses to the event. The incident occurred indoors and weather was not a factor. The employee had surgery on October 16, 2015 to repair the torn tendon. The employee died on November 11, 2015 from complications of the surgery.
No citations from this inspection.
Inspection 313786600 OPENED JAN 24, 2011Closed
Complaint · Partial · Health · 1,300 employees at the site · Closed Mar 24, 2011
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Perrysburg site logged 35 recordable injuries or illnesses among about 2,994 workers: 1.1 per 100 full-time workers, against a median of 0.5 for its industry. Those cases cost 176 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
First Solar Perrysburg - PGT1 & Office, PGT2, PGT3, PGT4
Perrysburg · 2025
2,994
35
6
1.1
0.5
First Solar Perrysburg - PGT1 & Office, PGT2
Perrysburg · 2023
2,609
37
10
1.4
0.5
First Solar Perrysburg
Perrysburg · 2019
1,511
18
6
1.1
0.5
Severe injury reports
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 3 reports on file.
Aug 3, 2020, Walbridge: Hospitalization · internal injuries to organs and blood vessels of the trunk · abdomen, except internal location of diseases or disorders
On August 3, 2020, an employee was descending a metal staircase and fell three steps from the bottom. The employee fell against the step or hand rail and injured their abdomen. The employee suffered a lacerated spleen.
Feb 21, 2020, Walbridge: Hospitalization · hernias due to traumatic incidents · abdomen, except internal location of diseases or disorders
Two employees were lifting a solar panel when one of them suffered a hernia. The employee was hospitalized, undergoing surgery.
On April 18, 2018, an employee was helping to clean out heat exchangers when a metal rod attached to a cordless drill used to clean salt deposits slipped and fractured/lacerated the employee's right thumb.
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
(ii) Product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals, and which, in conjunction with the other information immediately available to employees under the hazard communication program, will provide employees with the specific information regarding the physical and health hazards of the hazardous chemical.
(B) Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy;
29 CFR 1910.147(d)
(d) Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence:
Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.