OSHA SearchOSHA records by employer

Forsa Construction, LLC: OSHA inspections and violations

Jersey City, New Jersey · Poured Concrete Foundation and Structure Contractors · NAICS 238110

22inspections
45citation items
$118,173current penalties
Jan 8, 2025last inspection

OSHA has inspected Forsa Construction, LLC 22 times in New Jersey since 1996.

The latest one began on Jan 8, 2025 on a referral, in Jersey City.

Those inspections ended with 45 citation items: 27 serious, 3 repeat and 15 other-than-serious.

Penalties were first proposed at $217,315 and now stand at $118,173, 46% lower after settlements or reviews.

Fall protection in construction comes up most often in these citations: 12 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Forsa Construction, LLC averages $15,621 (4 cited inspections).

Forsa Construction, LLC: OSHA citation items per year, 1996 to 2025
Citation items per year, by inspection date.

New Jersey · latest 90 days of OSHA records

270employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in New Jersey: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New Jersey

Checking a subcontractor, a client or your own company? Watch Forsa Construction, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347969826 OPENED JAN 8, 2025Closed

Referral · Partial · Safety · 40 employees at the site · Closed Aug 26, 2026

420 Marin Blvd, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.250(a)(1) · General requirements for storage
Other-than-serious$11,585$7,000Jul 8, 2025Final

Inspection 343943981 OPENED APR 17, 2019Closed

Planned · Complete · Safety · 30 employees at the site · Closed May 7, 2019

99 Hudson St., Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343562229 OPENED AUG 20, 2018Closed

Referral · Partial · Safety · 180 employees at the site · Closed Dec 27, 2018

99 Hudson St., Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.502(b)(1) · Fall protection systems
Other-than-serious$9,147$7,325Nov 15, 2018Final
Citation 1, item 3
29 CFR 1926.1053(b)(1) · Ladders in construction
Other-than-serious$7,317$7,325Nov 15, 2018Final

Inspection 342695772 OPENED OCT 3, 2017Closed

Referral · Partial · Safety · 100 employees at the site · Closed Mar 22, 2018

99 Hudson St, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Other-than-serious$5,577$0Dec 8, 2017Final
Citation 1, item 2a
29 CFR 1926.501(b)(4)(i) · Fall protection in construction
Serious$9,760$9,000Dec 8, 2017Final
Citation 1, item 2b
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Serious$9,760$0Dec 8, 2017Final
Citation 2, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$19,520$10,520Dec 8, 2017Final

Inspection 342429628 OPENED JUN 22, 2017Closed

Referral · Partial · Safety · 80 employees at the site · Closed Nov 15, 2017

10 Provost St., Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341558278 OPENED JUN 10, 2016Closed

Complaint · Partial · Safety · 75 employees at the site · Closed Aug 11, 2017

430 Marin Blvd, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1053(b)(13) · Ladders in construction
Other-than-serious$5,510$0Sep 14, 2016Final
Citation 2, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$15,713$10,657Sep 14, 2016Final
Citation 2, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$13,718$10,657Sep 14, 2016Final

Inspection 339423030 OPENED SEP 23, 2013Closed

Referral · Partial · Safety · 75 employees at the site · Closed Jul 28, 2016

110 First Street, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.502(d)(6)(ii) · Fall protection systems
Serious$4,620$2,695Dec 4, 2013Final
Citation 1, item 3
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$3,850$2,695Dec 4, 2013Final
Citation 1, item 5
29 CFR 1926.1053(b)(7) · Ladders in construction
Serious$3,080$2,695Dec 4, 2013Final

Inspection 339104325 OPENED JUN 4, 2013Closed

Planned · Complete · Safety · 90 employees at the site · Closed Apr 4, 2014

800 Park Avenue, Fort Lee, NJ 07024 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.20(b)(4) · Construction safety programs
Serious$5,670$5,000Jul 5, 2013Final
Citation 1, item 2a
29 CFR 1926.502(i)(3) · Fall protection systems
Serious$5,670$5,000Jul 5, 2013Final
Citation 1, item 2b
29 CFR 1926.502(i)(4) · Fall protection systems
Serious$0$0Jul 5, 2013Final
Citation 1, item 3
29 CFR 1926.702(j)(1) · Requirements for equipment and tools
Serious$5,670$0Jul 5, 2013Final
Citation 2, item 1
29 CFR 1926.703(a)(2) · Requirements for cast-in-place concrete
Other-than-serious$810$0Jul 5, 2013Final
14 older inspections

Inspection 338906530 OPENED FEB 15, 2013Closed

Referral · Partial · Health · 90 employees at the site · Closed Apr 29, 2013

1100 Maxwell Lane, Hoboken, NJ 07030 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 338253412 OPENED JAN 11, 2013Closed

Unprogrammed other · Complete · Safety · 120 employees at the site · Closed Dec 5, 2013

1025 Maxwell Lane, Hoboken, NJ 07030 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Other-than-serious$6,300$3,780Apr 25, 2013Final
Citation 1, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Other-than-serious$6,300$3,780Apr 25, 2013Final

Inspection 310163498 OPENED SEP 19, 2006Closed

Referral · Partial · Safety · 100 employees at the site · Closed Jun 18, 2007

100-101 Christopher Columbus Drive, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(c) · Fall protection in construction
Other-than-serious$5,000$1,000Feb 21, 2007Final

Inspection 310162144 OPENED JUL 26, 2006Closed

Referral · Partial · Safety · 50 employees at the site · Closed Jan 5, 2007

88 Morgan Street, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310077169 OPENED JUN 23, 2006Closed

Referral · Partial · Safety · 100 employees at the site · Closed Apr 17, 2007

88 Morgan Street, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.602(c)(1)(vi) · Earthmovers and forklifts in construction
Serious$5,000$1,500Nov 29, 2006Final

Inspection 309175156 OPENED JUL 21, 2005Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Sep 7, 2005

103-105 Greene Street, Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(3) · Fall protection in construction
Serious$4,000$2,400Aug 8, 2005Closed
Citation 1, item 1b
29 CFR 1926.501(b)(4)(i) · Fall protection in construction
Serious$0$0Aug 8, 2005Closed

Inspection 306236316 OPENED APR 18, 2003Closed

Referral · Partial · Safety · 70 employees at the site · Closed Jun 25, 2003

425 Washington Blvd., Jersey City, NJ 07302 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 305974883 OPENED JAN 2, 2003Closed

Complaint · Partial · Health · 115 employees at the site · Closed Mar 28, 2003

425 Washington Blvd., Jersey City, NJ 07302 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$975$500Mar 6, 2003Closed
Citation 1, item 2
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$975$500Mar 6, 2003Closed
Citation 1, item 3
29 CFR 1910.134(g)(1)(ia) · Respiratory protection
Other-than-serious$975$0Mar 6, 2003Closed
Citation 1, item 4
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$975$500Mar 6, 2003Closed
Citation 1, item 5
29 CFR 1926.502(d)(16)(iii) · Fall protection systems
Serious$1,625$1,400Mar 6, 2003Closed
Citation 1, item 6
29 CFR 1926.502(j)(1) · Fall protection systems
Serious$1,625$500Mar 6, 2003Closed
Citation 2, item 1
29 CFR 1910.134(c)(1) · Respiratory protection
Other-than-serious$650$0Mar 6, 2003Closed

Inspection 304263809 OPENED JUL 10, 2001Closed

Unprogrammed other · Complete · Safety · 80 employees at the site · Closed Nov 7, 2002

88 Morgan Street, Jersey City, NJ 07302 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Repeat$20,000$7,500Oct 2, 2001Final

Inspection 302131933 OPENED MAR 11, 1999Closed

Planned · Complete · Safety · 60 employees at the site · Closed Nov 16, 1999

107 Montgomery Street, Jersey City, NJ 07302 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.250(b)(8)(i) · General requirements for storage
Serious$675$200Sep 9, 1999Closed
Citation 1, item 2
29 CFR 1926.350(a)(7) · Gas welding and cutting
Serious$900$500Sep 9, 1999Closed
Citation 1, item 4
29 CFR 1926.550(a)(9) · [Reserved]
Serious$900$500Sep 9, 1999Closed
Citation 2, item 2a
29 CFR 1926.501(b)(1) · Fall protection in construction
Repeat$15,000$7,500Sep 9, 1999Closed
Citation 2, item 2b
29 CFR 1926.502(a)(2) · Fall protection systems
Serious$1,125$0Sep 9, 1999Closed

Inspection 302132030 OPENED MAR 11, 1999Closed

Planned · Records only · Safety · 60 employees at the site · Closed Jan 5, 2011

107 Montgomery Street, Jersey City, NJ 07302 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 302127253 OPENED MAY 29, 1998Closed

Unprogrammed other · Complete · Safety · 90 employees at the site · Closed Oct 22, 1998

Avalon Cove, Jersey City, NJ 07303 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(3) · Fall protection in construction
Serious$1,500$1,050Sep 9, 1998Closed
Citation 2, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Repeat$3,000$2,450Sep 9, 1998Closed
Citation 3, item 1
29 CFR 1926.502(b)(2) · Fall protection systems
Other-than-serious$0$0Sep 9, 1998Closed
Citation 3, item 2
29 CFR 1926.550(a)(2) · [Reserved]
Other-than-serious$0$0Sep 9, 1998Closed
Citation 3, item 3
29 CFR 1926.1052(c)(1) · Stairways in construction
Other-than-serious$0$0Sep 9, 1998Closed

Inspection 300024031 OPENED MAY 9, 1997Closed

Unprogrammed related · Complete · Safety · 8 employees at the site · Closed Jul 11, 1997

155 Washington Street, Jersey City, NJ 07302 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Other-than-serious$169$0May 15, 1997Closed
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$169$169May 15, 1997Closed

Inspection 300021425 OPENED NOV 27, 1996Closed

Unprogrammed related · Complete · Safety · 50 employees at the site · Closed Mar 10, 1997

155 Washington Street, Jersey City, NJ 07302 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(4)(i) · Fall protection in construction
Serious$2,500$1,875Feb 7, 1997Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(c)(1)

(1) The test instrument must have an effective audio-warning device, or a visual-warning device in the form of a screen tracing, that indicates when the test subject fails to hold his or her breath during the test. The test must be terminated and restarted from the beginning when the test subject fails to hold his or her breath during the test. The test subject then may be refitted and retested.

29 CFR 1910.134(e)(1)

(1) General. The employer shall provide a medical evaluation to determine the employee's ability to use a respirator, before the employee is fit tested or required to use the respirator in the workplace. The employer may discontinue an employee's medical evaluations when the employee is no longer required to use a respirator.

29 CFR 1910.134(f)(2)

(2) Deep breathing. In a normal standing position, the subject shall breathe slowly and deeply, taking caution so as not to hyperventilate.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.250 · General requirements for storage

29 CFR 1926.350 · Gas welding and cutting

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.550 · [Reserved]

29 CFR 1926.602 · Earthmovers and forklifts in construction

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

29 CFR 1926.702 · Requirements for equipment and tools

29 CFR 1926.703 · Requirements for cast-in-place concrete

Other poured concrete foundation and structure contractors employers in New Jersey

Alert subscribers get notified of each newly cited employer in New Jersey the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.