OSHA SearchOSHA records by employer

Frost Building Maintenance, Inc.: OSHA inspections and violations

Cleveland, Ohio · Masonry Contractors · NAICS 238140

9inspections
15citation items
$12,255current penalties
Aug 13, 2024last inspection

Since 2000, OSHA inspectors have visited Frost Building Maintenance, Inc. in Ohio 9 times.

The most recent inspection opened on Aug 13, 2024 as a planned inspection, in Cleveland.

In all, OSHA issued 15 citation items: 13 serious and 2 other-than-serious.

The proposed penalties came to $22,261; today they stand at $12,255, 45% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 10 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Frost Building Maintenance, Inc. averages $2,240 across 3 cited inspections.

Frost Building Maintenance, Inc. also files yearly injury logs with OSHA, summarized below.

Frost Building Maintenance, Inc.: OSHA citation items per year, 2000 to 2024
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

265employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Frost Building Maintenance, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347682841 OPENED AUG 13, 2024Closed

Planned · Partial · Safety · 4 employees at the site · Closed Dec 2, 2025

3028 Prospect Avenue, Cleveland, OH 44101 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.502(d)(15) · Fall protection systems
Serious$4,610$1,844Aug 27, 2024Final
Citation 1, item 1b
29 CFR 1926.502(e)(2) · Fall protection systems
Serious$0$0Aug 27, 2024Final

Inspection 346334378 OPENED NOV 9, 2022Closed

Planned · Partial · Safety · 4 employees at the site · Closed Jan 6, 2023

1939 W 25th Street, Cleveland, OH 44113 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345635023 OPENED NOV 10, 2021Closed

Complaint · Partial · Safety · 2 employees at the site · Closed Dec 30, 2021

2592 West 14th St, Cleveland, OH 44113 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$3,901$2,341Dec 10, 2021Final
Citation 2, item 1
29 CFR 1926.451(c)(2)(ii) · Scaffolds, general requirements
Other-than-serious$0$0Dec 10, 2021Final

Inspection 342629789 OPENED SEP 12, 2017Closed

Planned · Partial · Safety · 20 employees at the site · Closed Oct 10, 2017

50 North Prospect Street, Akron, OH 44304 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$5,070$2,535Sep 20, 2017Final

Inspection 335689402 OPENED AUG 9, 2012Closed

Planned · Partial · Safety · 15 employees at the site · Closed Sep 18, 2012

103-111 South Hamden, Chardon, OH 44024 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$1,530$1,530Aug 27, 2012Final

Inspection 315151522 OPENED NOV 29, 2010Closed

Planned · Partial · Safety · 26 employees at the site · Closed Dec 1, 2010

110 South Hambden, Chardon, OH 44024 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 303483861 OPENED AUG 18, 2000Closed

Planned · Complete · Safety · 16 employees at the site · Closed Oct 3, 2000

Miller Hall, John Carroll University, University Heights, OH 44118 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1)(ii) · Scaffolds, general requirements
Serious$1,000$600Sep 11, 2000Closed
Citation 1, item 1b
29 CFR 1926.454(c) · Scaffold training
Serious$0$0Sep 11, 2000Closed
Citation 1, item 2
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,000$1,200Sep 11, 2000Closed
Citation 1, item 3
29 CFR 1926.451(h)(1) · Scaffolds, general requirements
Other-than-serious$600$0Sep 11, 2000Closed

Inspection 118122696 OPENED JUN 8, 2000Closed

Planned · Complete · Safety · 3 employees at the site · Closed Aug 1, 2000

United Church Of Christ, 22 Liberty Street, Painesville, OH 44077 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$600$360Jun 13, 2000Closed
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$800$480Jun 13, 2000Closed
Citation 1, item 3
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$1,400$840Jun 13, 2000Closed
1 older inspection

Inspection 118128636 OPENED MAR 8, 2000Closed

Planned · Complete · Safety · 5 employees at the site · Closed Mar 31, 2000

12231 Main Avenue, Cleveland, OH 44113 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$525$368Mar 10, 2000Closed
Citation 1, item 2
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$225$158Mar 10, 2000Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2024, the Cleveland site logged 1 recordable injury or illness among about 19 workers: 5.4 per 100 full-time workers, against a median of 2.8 for its industry. Those cases cost 6 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Frost Building Maintenance, Inc
Cleveland · 2024
19 115.42.8

Included with any plan: 7 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(ii)

(ii) Where the employer makes the demonstration provided for in paragraph (b)(1)(i) of this section, the platform shall be planked or decked as fully as possible and the remaining open space between the platform and the uprights shall not exceed 9 1/2 inches (24.1 cm).

29 CFR 1926.451(c)(2)(i)

(i) Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

Other masonry contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.