OSHA SearchOSHA records by employer

Gabriel Lopez: OSHA inspections and violations

Irving, Texas · Masonry Contractors · NAICS 238140

2inspections
5citation items
$1,500current penalties
Jan 17, 2025last inspection

OSHA has inspected Gabriel Lopez 2 times in Texas since 2015.

The latest one began on Jan 17, 2025 on a referral, in Richmond.

Those inspections ended with 5 citation items: 5 serious.

Penalties were first proposed at $10,000 and now stand at $1,500, 85% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 4 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Gabriel Lopez averages $1,500 (1 cited inspection).

Gabriel Lopez: OSHA citation items per year, 2015 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Gabriel Lopez again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348038563 OPENED JAN 17, 2025Closed

Referral · Partial · Safety · 3 employees at the site · Closed Apr 4, 2025

427 Yellow Dandelion Ln, Richmond, TX 77406 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341140093 OPENED DEC 23, 2015Closed

Planned · Partial · Safety · 3 employees at the site · Closed Jul 20, 2016

1001 Lake Carolyn Pkway, Irving, TX 75039 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$2,000$500Feb 4, 2016Final
Citation 1, item 2a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$2,000$1,000Feb 4, 2016Final
Citation 1, item 2b
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$2,000$0Feb 4, 2016Final
Citation 1, item 2c
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,000$0Feb 4, 2016Final
Citation 1, item 2d
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,000$0Feb 4, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.