OSHA SearchOSHA records by employer

Gage Pattern & Model Inc: OSHA inspections and violations

Madison Heights, Michigan · Special Die and Tool, Die Set, Jig, and Fixture Manufacturing · NAICS 333514

5inspections
50citation items
$5,210current penalties
Jul 12, 2018last inspection

Gage Pattern & Model Inc has 5 OSHA inspections on record in Michigan, the first in 1993.

OSHA's last visit started on Jul 12, 2018 as a planned inspection, in Madison Heights.

Across those inspections OSHA issued 50 citation items: 22 serious and 28 other-than-serious.

OSHA proposed $8,900 in penalties. After settlements and reviews the total is $5,210, down 41%.

Most often, OSHA cited 1910.1200, hazard communication (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Gage Pattern & Model Inc averages $1,700 over 1 cited inspection in that time.

Gage Pattern & Model Inc also files yearly injury logs with OSHA, summarized below.

Gage Pattern & Model Inc: OSHA citation items per year, 1993 to 2018
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

670employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Gage Pattern & Model Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343291837 OPENED JUL 12, 2018Closed

Planned · Complete · Safety · 25 employees at the site · Closed Nov 21, 2018

32070 Townley St, Madison Heights, MI 48071 · All Other Miscellaneous Fabricated Metal Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10727(1)
Serious$400$400Sep 7, 2018Final
Citation 1, item 2
29 CFR 408.12622(1)
Serious$400$400Sep 7, 2018Final
Citation 1, item 3
29 CFR 408.12635(2)(A)
Serious$400$400Sep 7, 2018Final
Citation 1, item 4a
29 CFR 408.13312(1)
Serious$500$500Sep 7, 2018Final
Citation 1, item 4b
29 CFR 325.47201(3)
Serious$0$0Sep 7, 2018Final
Citation 2, item 1
29 CFR 408.10632(5)
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 2a
29 CFR 408.11222(1)
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 2b
29 CFR 408.11222(3)
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 3
29 CFR 408.13308(3)
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 4
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 5a
29 CFR 1910.107(b)(6) · Spray painting and finishing
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 5b
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$0$0Sep 7, 2018Final
Citation 2, item 6
29 CFR 1910.1200(f)(6) · Hazard communication
Other-than-serious$0$0Sep 7, 2018Final

Inspection 312037203 OPENED JAN 15, 2010Closed

Planned · Complete · Safety · 30 employees at the site · Closed Apr 2, 2010

32070 Townley, Madison Heights, MI 48071 · Special Die and Tool, Die Set, Jig, and Fixture Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$450$180Feb 19, 2010Closed
Citation 1, item 2 Serious$450$225Feb 19, 2010Closed
Citation 1, item 3 Serious$450$180Feb 19, 2010Closed
Citation 1, item 4a Serious$450$225Feb 19, 2010Closed
Citation 1, item 4b Serious$0$0Feb 19, 2010Closed
Citation 2, item 1 Other-than-serious$0$0Feb 19, 2010Closed
Citation 2, item 2 Other-than-serious$0$0Feb 19, 2010Closed
Citation 2, item 3 Other-than-serious$0$0Feb 19, 2010Closed
Citation 2, item 4 Other-than-serious$0$0Feb 19, 2010Closed
Citation 2, item 5
29 CFR 1910.110(f)(2)(ii) · Storage and handling of liquefied petroleum gases
Other-than-serious$0$0Feb 19, 2010Closed
Citation 2, item 6
29 CFR 1910.1200(f)(5) · Hazard communication
Other-than-serious$0$0Feb 19, 2010Closed

Inspection 127095008 OPENED JUL 13, 2000Closed

Planned · Complete · Safety · 14 employees at the site · Closed Nov 15, 2000

32070 Townley, Madison Heights, MI 48071 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$450$225Aug 25, 2000Closed
Citation 1, item 2 Serious$600$300Aug 25, 2000Closed
Citation 1, item 3 Serious$600$300Aug 25, 2000Closed
Citation 1, item 4 Serious$600$300Aug 25, 2000Closed
Citation 1, item 5 Serious$600$300Aug 25, 2000Closed
Citation 1, item 6 Serious$600$300Aug 25, 2000Closed
Citation 1, item 7 Serious$450$225Aug 25, 2000Closed
Citation 1, item 8 Serious$600$300Aug 25, 2000Closed
Citation 1, item 9
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$450$225Aug 25, 2000Closed
Citation 2, item 1 Other-than-serious$300$150Aug 25, 2000Closed
Citation 2, item 2 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 3 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 4 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 5 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 6 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 7 Other-than-serious$0$0Aug 25, 2000Closed
Citation 2, item 8 Other-than-serious$0$0Aug 25, 2000Closed

Inspection 114799398 OPENED AUG 23, 1993Closed

Planned · Complete · Safety · 40 employees at the site · Closed Dec 29, 1993

32070 Townley, Madison Heights, MI 48071 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$75$38Oct 14, 1993Closed
Citation 1, item 2
29 CFR 1910.1200(h) · Hazard communication
Serious$75$38Oct 14, 1993Closed
Citation 1, item 3 Serious$0$0Oct 14, 1993Closed
Citation 2, item 1 Other-than-serious$0$0Oct 14, 1993Closed
Citation 2, item 2 Other-than-serious$0$0Oct 14, 1993Closed
Citation 2, item 3 Other-than-serious$0$0Oct 14, 1993Closed
Citation 2, item 4 Other-than-serious$0$0Oct 14, 1993Closed

Inspection 114799406 OPENED AUG 23, 1993Closed

Planned · Complete · Safety · 40 employees at the site · Closed Nov 19, 1993

32341 Edward, Madison Heights, MI 48071 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$0$0Oct 14, 1993Closed
Citation 1, item 2 Other-than-serious$0$0Oct 14, 1993Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Madison Heights site logged 0 recordable injuries or illnesses among about 19 workers: 0.0 per 100 full-time workers, against a median of 2.3 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Gage Pattern & Model Inc.
Madison Heights · 2025
19 000.02.3
Gage Pattern & Model, Inc.
Madison Heights · 2024
21 000.02.3

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(6)

(6) Frontal area. Each spray booth having a frontal area larger than 9 square feet shall have a metal deflector or curtain not less than 2 1/2 inches deep installed at the upper outer edge of the booth over the opening.

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(f)(2)(ii)

(ii) Containers when stored inside shall not be located near exits, stairways, or in areas normally used or intended for the safe exit of people.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 3090.110

29 CFR 4080.1014

29 CFR 4081.121

29 CFR 4081.1222

29 CFR 4081.1223

29 CFR 4081.125

29 CFR 4081.187

29 CFR 4081.2131

29 CFR 4081.2154

29 CFR 4081.2161

29 CFR 4081.2163

29 CFR 4081.2635

29 CFR 4081.2722

29 CFR 4081.2732

29 CFR 4081.2737

29 CFR 4081.33

29 CFR 4081.3308

29 CFR 4081.3312

29 CFR 4081.36

29 CFR 4081.645

29 CFR 4081.716

29 CFR 4081.727

29 CFR 4082.2111

Other special die and tool, die set, jig, and fixture manufacturing employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.