OSHA SearchOSHA records by employer

Genco Energy Services, Inc.: OSHA inspections and violations

Pecos, Texas · Support Activities for Oil and Gas Operations · NAICS 213112

4inspections
5citation items
$10,352current penalties
Oct 18, 2016last inspection

OSHA has inspected Genco Energy Services, Inc. 4 times in Texas since 2013.

The latest one began on Oct 18, 2016 as a planned inspection, in Pecos.

Those inspections ended with 5 citation items: 1 serious, 1 repeat and 3 other-than-serious.

Penalties were first proposed at $17,486 and now stand at $10,352, 41% lower after settlements or reviews.

Grounding and circuit protection comes up most often in these citations: 2 items under 1910.304.

How that compares: the median penalty per cited inspection for mining and oil and gas employers since 2015 is $2,883, and Genco Energy Services, Inc. averages $3,326 (2 cited inspections).

Genco Energy Services, Inc.: OSHA citation items per year, 2013 to 2016
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

401employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Genco Energy Services, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341861573 OPENED OCT 18, 2016Closed

Planned · Complete · Safety · 15 employees at the site · Closed Feb 22, 2017

Lease 007 Swd Sec. 23 Blk. 51 T8s, Pecos, TX 79772 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Repeat$3,586$2,152Feb 1, 2017Final

Inspection 341117711 OPENED DEC 8, 2015Closed

Unprogrammed other · Partial · Safety · 184 employees at the site · Closed May 16, 2016

Folk Rolwings A 4-34 33, Well #1h, Nomac Rig #54, 8.2 Miles Nw From Pecos, Pecos, TX 79772 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$4,500$4,500Mar 18, 2016Final
Citation 2, item 1
29 CFR 1910.305(g)(1)(i) · Electrical wiring methods
Other-than-serious$0$0Mar 18, 2016Final

Inspection 339635278 OPENED MAR 13, 2014Closed

Planned · Complete · Safety · 1 employee at the site · Closed Apr 11, 2014

Dieste Unit 1h 3 Miles South Hwy 80, Nixon, TX 78140 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Serious$4,500$2,700Apr 1, 2014Final

Inspection 338909351 OPENED FEB 12, 2013Closed

Planned · Complete · Safety · 2 employees at the site · Closed Apr 26, 2013

Rig 8, Coyote 48, Well No. 1 26.9 Miles Nw Of Fort Stockton, Fort Stockton, TX 79735 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Other-than-serious$4,900$1,000Apr 5, 2013Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(2)

(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.

29 CFR 1910.303(g)(1)

(1) Space about electric equipment. Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(g)(5)

(5) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective.

29 CFR 1910.305 · Electrical wiring methods

Other support activities for oil and gas operations employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.