OSHA SearchOSHA records by employer

Georgetown Ice the Ice House, LLC: OSHA inspections and violations

Thomasville, Georgia · Ice Manufacturing · NAICS 312113

2inspections
5citation items
$11,271current penalties
Oct 17, 2023last inspection

OSHA has inspected Georgetown Ice the Ice House, LLC 2 times in Georgia since 2018.

The latest one began on Oct 17, 2023 after a complaint, in Thomasville.

Those inspections ended with 5 citation items: 3 serious and 2 other-than-serious.

Penalties were first proposed at $22,542 and now stand at $11,271, 50% lower after settlements or reviews.

Electrical equipment, general requirements comes up most often in these citations: 2 items under 1910.303.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,860, and Georgetown Ice the Ice House, LLC averages $5,636 (2 cited inspections).

Georgetown Ice the Ice House, LLC: OSHA citation items per year, 2018 to 2023
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

150employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Georgetown Ice the Ice House, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347039315 OPENED OCT 17, 2023Closed

Complaint · Partial · Safety · 11 employees at the site · Closed Dec 14, 2023

1411 Glenwood Drive, Thomasville, GA 31792 · Ice Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(1)(i) · Electrical wiring methods
Other-than-serious$0$0Nov 14, 2023Final

Inspection 343580437 OPENED NOV 2, 2018Closed

Complaint · Partial · Safety · 7 employees at the site · Closed Jan 7, 2020

1411 Glenwood Drive, Thomasville, GA 31792 · Ice Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$9,282$4,641Apr 30, 2019Final
Citation 1, item 2
29 CFR 1910.303(c)(3)(i) · Electrical equipment, general requirements
Serious$6,630$3,315Apr 30, 2019Final
Citation 1, item 3
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$6,630$3,315Apr 30, 2019Final
Citation 2, item 1
29 CFR 1910.178(l)(2)(ii) · Forklifts and other powered industrial trucks
Other-than-serious$0$0Apr 30, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(1)

(c) General—(1) Energy control program. The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections to ensure that before any employee performs any servicing or maintenance on a machine or equipment where the unexpected energizing, start up or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, and rendered inoperative.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.178(l)(2)(ii)

(ii) Training shall consist of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(c)(3)(i)

(3) Splices. (i) Conductors shall be spliced or joined with splicing devices identified for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be spliced or joined to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose.

29 CFR 1910.305 · Electrical wiring methods

Other ice manufacturing employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.