Inspection 347911935 OPENED DEC 3, 2024Closed
1250 Cabela Dr, Sun Prairie, WI 53590 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Sun Prairie, Wisconsin · Roofing Contractors · NAICS 238160
OSHA has inspected GL Construction of Madison LLC 5 times in Wisconsin since 2021.
The latest one began on Dec 3, 2024 after a complaint, in Sun Prairie.
Those inspections ended with 25 citation items: 18 serious, 1 willful, 3 repeat and 3 other-than-serious.
Penalties were first proposed at $227,010 and now stand at $141,728, 38% lower after settlements or reviews.
Fall protection in construction comes up most often in these citations: 3 items under 1926.501.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and GL Construction of Madison LLC averages $35,432 (4 cited inspections).
1 inspection on this page followed a fatal incident.
Wisconsin · latest 90 days of OSHA records
216employers cited
47 of them in the same industry
Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Wisconsin
Checking a subcontractor, a client or your own company? Watch GL Construction of Madison LLC and get notified the morning OSHA posts a new citation for it.
Watch this company1250 Cabela Dr, Sun Prairie, WI 53590 · Framing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
7549 Peyton Parkway (lot 4), Verona, WI 53593 · Framing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.20(b)(1) · Construction safety programs |
Serious | $12,676 | $7,600 | Aug 8, 2024 | Final |
| Citation 1, item 2a 29 CFR 1926.21(b)(2) · Construction safety training |
Serious | $12,676 | $7,600 | Aug 8, 2024 | Final |
| Citation 1, item 2b 29 CFR 1926.503(a)(1) · Fall protection training in construction |
Serious | $0 | $0 | Aug 8, 2024 | Final |
| Citation 1, item 2c 29 CFR 1926.1060(a) · Ladder and stairway training |
Serious | $0 | $0 | Aug 8, 2024 | Final |
| Citation 1, item 3 29 CFR 1926.102(a)(1) · Eye and face protection in construction |
Serious | $7,604 | $4,600 | Aug 8, 2024 | Final |
| Citation 1, item 4 29 CFR 1926.1053(b)(13) · Ladders in construction |
Serious | $12,676 | $7,600 | Aug 8, 2024 | Final |
| Citation 1, item 5 29 CFR 1926.1427(c)(2) · Operator training, certification, and evaluation |
Serious | $12,676 | $7,600 | Aug 8, 2024 | Final |
| Citation 2, item 1 29 CFR 1926.100(a) · Hard hats in construction |
Repeat | $25,353 | $15,500 | Aug 8, 2024 | Final |
| Citation 2, item 2 29 CFR 1926.1053(b)(1) · Ladders in construction |
Repeat | $25,353 | $15,500 | Aug 8, 2024 | Final |
| Citation 3, item 1 29 CFR 1926.501(b)(13) · Fall protection in construction |
Willful | $35,491 | $22,000 | Aug 8, 2024 | Final |
6653 Wagners Vineyard Trail, Sun Prairie, WI 53590 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 2, item 1 29 CFR 1926.501(b)(13) · Fall protection in construction |
Repeat | $35,488 | $12,420 | Mar 29, 2024 | Final |
4671-4683 Bellflower Drive, De Forest, WI 53532 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
Incident on Apr 20, 2022 (fatal): Employee dies when struck by wall caught by wind gust
At 2:30 p.m. on April 20, 2022, an employee was working with a crew of coworkers erecting interior walls within a building. The employee, a construction laborer, and three coworkers were framing, installing and bracing the walls of a residential building on the second level. The wall measured greater than 40 feet in length and about 8 feet in height and weighed an estimated 1,000 pounds to 2,000 pounds. The employer was using a crane with a tow strap sling attachment to assist the crew in lifting up the walls from a flat position to a vertical position. The sling had end loops attached to the wall with two 2 inch by 6 foot boards tacked with 3 inch framing nails. The boards were situated inside the end loops of the sling. While the wall was being stood upright by the the crew in order to be braced, a reported high gust of wind caused the wall tip over and strike the employee. The employee incurred severe blunt force trauma and was killed. The wall was partially braced and disconnected from the crane at the time it fell. The activities were taking place in high wind conditions and wind gusts of up to 40 miles per hour were reported. Weather and the high wind conditions were likely a factor to the event. The operation was not adjusted to address the effects of high winds.
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.20(b)(2) · Construction safety programs |
Serious | $11,396 | $9,664 | Sep 23, 2022 | Final |
| Citation 1, item 2 29 CFR 1926.100(a) · Hard hats in construction |
Serious | $3,419 | $2,902 | Sep 23, 2022 | Final |
| Citation 1, item 3 29 CFR 1926.251(a)(2)(ii) · Rigging equipment for material handling |
Serious | $3,419 | $2,902 | Sep 23, 2022 | Final |
| Citation 1, item 4 29 CFR 1926.251(a)(4) · Rigging equipment for material handling |
Serious | $4,786 | $4,068 | Sep 23, 2022 | Final |
| Citation 1, item 5 29 CFR 1926.501(b)(13) · Fall protection in construction |
Serious | $2,735 | $2,324 | Sep 23, 2022 | Final |
| Citation 1, item 6 29 CFR 1926.753(d)(2)(iii) · Hoisting and rigging |
Serious | $3,419 | $2,902 | Sep 23, 2022 | Final |
| Citation 1, item 7 29 CFR 1926.1412(f)(1) · Inspections |
Serious | $2,051 | $1,743 | Sep 23, 2022 | Final |
| Citation 1, item 8 29 CFR 1926.1417(n) · Operation |
Serious | $3,419 | $2,902 | Sep 23, 2022 | Final |
| Citation 1, item 9 29 CFR 1926.1428(a) · Signal person qualifications |
Serious | $3,419 | $2,947 | Sep 23, 2022 | Final |
| Citation 2, item 1a 29 CFR 1903.19(c)(1) · Proving cited hazards were fixed |
Other-than-serious | $413 | $413 | Jan 12, 2024 | Final |
| Citation 2, item 1b 29 CFR 1903.19(d)(1) · Proving cited hazards were fixed |
Other-than-serious | $0 | $0 | Jan 12, 2024 | Final |
2799 Endive Drive, Fitchburg, WI 53711 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.502(d) · Fall protection systems |
Serious | $4,096 | $4,096 | Jul 23, 2021 | Final |
| Citation 1, item 2 29 CFR 1926.1053(b)(1) · Ladders in construction |
Serious | $4,096 | $4,096 | Jul 23, 2021 | Final |
| Citation 2, item 1 29 CFR 1903.19(d)(1) · Proving cited hazards were fixed |
Other-than-serious | $349 | $349 | Feb 17, 2022 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1903.19(c)(1)
(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.
29 CFR 1903.19(d)(1)
(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.
29 CFR 1926.100(a)
(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.