OSHA SearchOSHA records by employer

Grahams Custom Body Shop: OSHA inspections and violations

Virginia Beach, Virginia · Automotive Body, Paint, and Interior Repair and Maintenance · NAICS 811121

1inspections
16citation items
$3,570current penalties
Jun 29, 2015last inspection

Grahams Custom Body Shop has one OSHA inspection on record in Virginia.

OSHA opened it on Jun 29, 2015 as a planned inspection, in Virginia Beach, and the case has not closed yet.

From that inspection OSHA issued 16 citation items: 16 serious.

OSHA proposed $7,140 in penalties. After settlements and reviews the total is $3,570, down 50%.

Most often, OSHA cited 1910.134, respiratory protection (6 items).

For context, across all repair and personal services employers the median penalty per cited inspection since 2015 is $1,200. Grahams Custom Body Shop averages $3,570 over 1 cited inspection in that time.

Grahams Custom Body Shop: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

250employers cited

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch Grahams Custom Body Shop and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340740414 OPENED JUN 29, 2015Open

Planned · Partial · Health · 10 employees at the site · Open

1121 Jensen Drive, Virginia Beach, VA 23451 · Automotive Body, Paint, and Interior Repair and Maintenance · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(d)(4)(i) · Flammable liquids
Serious$840$420Jul 21, 2015Final
Citation 1, item 2
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$840$420Jul 21, 2015Final
Citation 1, item 3
29 CFR 1910.107(e)(9) · Spray painting and finishing
Serious$840$420Jul 21, 2015Final
Citation 1, item 4a
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Serious$840$420Jul 21, 2015Final
Citation 1, item 4b
29 CFR 1910.132(f)(2) · Personal protective equipment, general requirements
Serious$0$0Jul 21, 2015Final
Citation 1, item 5a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$1,050$525Jul 21, 2015Final
Citation 1, item 5b
29 CFR 1910.134(d)(1)(i) · Respiratory protection
Serious$0$0Jul 21, 2015Final
Citation 1, item 5c
29 CFR 1910.134(d)(1)(iii) · Respiratory protection
Serious$0$0Jul 21, 2015Final
Citation 1, item 5d
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Jul 21, 2015Final
Citation 1, item 5e
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Jul 21, 2015Final
Citation 1, item 5f
29 CFR 1910.134(k)(1) · Respiratory protection
Serious$0$0Jul 21, 2015Final
Citation 1, item 6
29 CFR 1910.151(c) · First aid and eyewash
Serious$840$420Jul 21, 2015Final
Citation 1, item 7
29 CFR 1910.253(b)(4)(iii) · Gas welding and cutting
Serious$840$420Jul 21, 2015Final
Citation 1, item 8a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$1,050$525Jul 21, 2015Final
Citation 1, item 8b
29 CFR 1910.1200(f)(9) · Hazard communication
Serious$0$0Jul 21, 2015Final
Citation 1, item 8c
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Jul 21, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(4)(i)

(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.107(e)(9)

(9) Grounding. Whenever flammable liquids or liquids with a flashpoint greater than 199.4 °F (93 °C) are transferred from one container to another, both containers shall be effectively bonded and grounded to prevent discharge sparks of static electricity.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.151 · First aid and eyewash

29 CFR 1910.253 · Gas welding and cutting

Other automotive body, paint, and interior repair and maintenance employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.