OSHA SearchOSHA records by employer

Gulf Coast Contracting, LLC.: OSHA inspections and violations

Chippewa Falls, Wisconsin · Painting and Wall Covering Contractors · NAICS 238320

1inspections
5citation items
$3,360current penalties
Jul 9, 2015last inspection

OSHA inspectors have visited Gulf Coast Contracting, LLC. in Wisconsin one time.

It opened on Jul 9, 2015 as part of a related case, in Chippewa Falls.

In all, OSHA issued 5 citation items: 4 serious and 1 other-than-serious.

The proposed penalties came to $4,800; today they stand at $3,360, 30% less.

The rule cited most here is 1926.62 (lead in construction), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Gulf Coast Contracting, LLC. averages $3,360 across 1 cited inspection.

Gulf Coast Contracting, LLC.: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

229employers cited

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Gulf Coast Contracting, LLC. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340762897 OPENED JUL 9, 2015Closed

Programmed related · Partial · Health · 9 employees at the site · Closed Jan 20, 2016

Highway 53 Near Tilden, Chippewa Falls, WI 54729 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.178(a)(5) · Forklifts and other powered industrial trucks
Serious$1,600$1,120Dec 31, 2015Final
Citation 1, item 1b
29 CFR 1926.502(b)(2) · Fall protection systems
Serious$0$0Dec 31, 2015Final
Citation 1, item 2
29 CFR 1926.62(f)(2)(i) · Lead in construction
Serious$1,200$840Dec 31, 2015Final
Citation 1, item 3
29 CFR 1926.451(g)(3)(iii) · Scaffolds, general requirements
Serious$2,000$1,400Dec 31, 2015Final
Citation 2, item 2
29 CFR 1926.62(g)(2)(iv) · Lead in construction
Other-than-serious$0$0Dec 31, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.178(a)(5)

(5) If the truck is equipped with front-end attachments other than factory installed attachments, the user shall request that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(3)(iii)

(iii) When lanyards are connected to horizontal lifelines or structural members on a single-point or two-point adjustable suspension scaffold, the scaffold shall be equipped with additional independent support lines and automatic locking devices capable of stopping the fall of the scaffold in the event one or both of the suspension ropes fail. The independent support lines shall be equal in number and strength to the suspension ropes.

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.502(b)(2)

(2) Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members shall be installed between the top edge of the guardrail system and the walking/working surface when there is no wall or parapet wall at least 21 inches (53 cm) high.

29 CFR 1926.62 · Lead in construction

Other painting and wall covering contractors employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.