Since 1987, OSHA inspectors have visited Harvey Vogel Manufacturing Company in Minnesota 19 times.
The most recent inspection opened on Jan 2, 2025 as a planned inspection, in Saint Paul.
In all, OSHA issued 29 citation items: 16 serious and 13 other-than-serious.
The proposed penalties came to $14,674; today they stand at $7,396, 50% less.
The rule cited most here is 1910.217 (mechanical power presses), 5 times.
Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Harvey Vogel Manufacturing Company averages $1,075 across 2 cited inspections.
Harvey Vogel Manufacturing Company also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Minnesota · latest 90 days of OSHA records
364employers cited
Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Harvey Vogel Manufacturing Company and get notified the morning OSHA posts a new citation for it.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Woodbury site logged 5 recordable injuries or illnesses among about 207 workers: 2.4 per 100 full-time workers, against a median of 4.0 for its industry.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Harvey Vogel Manufacturing Co.
Woodbury · 2024
207
5
0
2.4
4.0
Harvey Vogel Manufacturing Co-Woodbury
Woodbury · 2017
179
7
3
4.0
4.0
Harvey Vogel Manufacturing Co-HV WEST
Eagan · 2017
22
1
0
6.0
4.0
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
(d) Exposure determination—(1) General. Each employer who has a workplace or work operation covered by this section shall determine the 8-hour TWA exposure for each employee exposed to chromium (VI). This determination shall be made in accordance with either paragraph (d)(2) or paragraph (d)(3) of this section.
29 CFR 1910.110 · Storage and handling of liquefied petroleum gases
29 CFR 1910.110(e)(4)(iii)
(iii) Permanent and removable fuel containers shall be securely mounted to prevent jarring loose, slipping, or rotating, and the fastenings shall be designed and constructed to withstand static loading in any direction equal to twice the weight of the tank and attachments when filled with fuel using a safety factor of not less than four based on the ultimate strength of the material to be used. Field welding, when necessary, shall be made only on saddle plates, lugs or brackets, originally attached to the container by the tank manufacturer.
(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.
Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.