OSHA SearchOSHA records by employer

HMC Construction LLC: OSHA inspections and violations

Bronx, New York · Commercial and Institutional Building Construction · NAICS 236220

1inspections
2citation items
$5,000current penalties
May 19, 2015last inspection

HMC Construction LLC has one OSHA inspection on record in New York.

OSHA opened it on May 19, 2015 on a referral, in Bronx.

From that inspection OSHA issued 2 citation items: 2 other-than-serious.

OSHA proposed $5,600 in penalties. After settlements and reviews the total is $5,000, down 11%.

Most often, OSHA cited 1926.752, site layout, site-specific erection plan and construction sequence (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. HMC Construction LLC averages $5,000 over 1 cited inspection in that time.

HMC Construction LLC: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

353employers cited

13 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch HMC Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340646835 OPENED MAY 19, 2015Closed

Referral · Partial · Safety · 2 employees at the site · Closed Dec 9, 2015

353 Zerega Ave., Bronx, NY 10473 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.752(a)(1) · Site layout, site-specific erection plan and construction sequence
Other-than-serious$2,800$2,500Oct 13, 2015Final
Citation 1, item 2
29 CFR 1926.752(a)(2) · Site layout, site-specific erection plan and construction sequence
Other-than-serious$2,800$2,500Oct 13, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.752 · Site layout, site-specific erection plan and construction sequence

29 CFR 1926.752(a)(1)

(1) The concrete in the footings, piers and walls and the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection.

29 CFR 1926.752(a)(2)

(2) Any repairs, replacements and modifications to the anchor bolts were conducted in accordance with § 1926.755(b).

Other commercial and institutional building construction employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.