Hoerauf Contracting: OSHA inspections and violations

Tappen, North Dakota · Site Preparation Contractors · NAICS 238910

1inspections
8citation items
$10,000current penalties
Oct 3, 2017last inspection

Hoerauf Contracting has one OSHA inspection on record in North Dakota.

OSHA opened it on Oct 3, 2017 as a planned inspection, in Tappen.

From that inspection OSHA issued 8 citation items: 8 serious.

OSHA proposed $18,848 in penalties. After settlements and reviews the total is $10,000, down 47%.

Most often, OSHA cited 1926.651, excavations (4 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Hoerauf Contracting averages $10,000 over 1 cited inspection in that time.

Hoerauf Contracting: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Want to know if OSHA cites Hoerauf Contracting again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 342683562 OPENED OCT 3, 2017Closed

Planned · Partial · Safety · 3 employees at the site · Closed Apr 16, 2018

Vicinity Of First Street Sw And Troy Avenue, Tappen, ND 58487 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
OSH Act Section 5(a)(1) · General Duty Clause
Serious$2,772$1,500Mar 15, 2018Final
Citation 1, item 2a
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$2,772$1,500Mar 15, 2018Final
Citation 1, item 2b
29 CFR 1926.405(j)(2)(ii) · Job-site wiring
Serious$0$0Mar 15, 2018Final
Citation 1, item 3
29 CFR 1926.651(c)(2) · Excavations
Serious$2,772$1,500Mar 15, 2018Final
Citation 1, item 4
29 CFR 1926.651(e) · Excavations
Serious$2,772$1,500Mar 15, 2018Final
Citation 1, item 5
29 CFR 1926.651(h)(1) · Excavations
Serious$3,880$2,000Mar 15, 2018Final
Citation 1, item 6a
29 CFR 1926.651(k)(2) · Excavations
Serious$3,880$2,000Mar 15, 2018Final
Citation 1, item 6b
29 CFR 1926.652(a)(1) · Trench protection
Serious$0$0Mar 15, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(j)(2)(ii)

(ii) Damp and wet locations. A receptacle installed in a wet or damp location shall be designed for the location.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.652 · Trench protection

OSH Act Section 5 · General Duty Clause

Other site preparation contractors employers in North Dakota

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.