OSHA SearchOSHA records by employer

Imac Systems, Inc.: OSHA inspections and violations

Tullytown, Pennsylvania · Totalizing Fluid Meter and Counting Device Manufacturing · NAICS 334514

2inspections
17citation items
$15,700current penalties
Oct 1, 2015last inspection

OSHA has inspected Imac Systems, Inc. 2 times in Pennsylvania since 2015.

The latest one began on Oct 1, 2015 on a referral, in Tullytown.

Those inspections ended with 17 citation items: 17 serious.

Penalties were first proposed at $21,700 and now stand at $15,700, 28% lower after settlements or reviews.

Spray painting and finishing comes up most often in these citations: 7 items under 1910.107.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Imac Systems, Inc. averages $7,850 (2 cited inspections).

Imac Systems, Inc.: OSHA citation items per year, 2015 to 2015
Citation items per year, by inspection date.

Pennsylvania · latest 90 days of OSHA records

297employers cited

Get notified the morning OSHA posts each new citation in Pennsylvania: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Pennsylvania

Checking a subcontractor, a client or your own company? Watch Imac Systems, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340957489 OPENED OCT 1, 2015Closed

Referral · Partial · Health · 28 employees at the site · Closed Apr 7, 2016

90 Main Street, Tullytown, PA 19007 · Totalizing Fluid Meter and Counting Device Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$2,800$2,100Feb 12, 2016Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$0$0Feb 12, 2016Final
Citation 1, item 1c
29 CFR 1910.107(g)(2) · Spray painting and finishing
Serious$0$0Feb 12, 2016Final
Citation 1, item 2a
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$2,800$2,100Feb 12, 2016Final
Citation 1, item 2b
29 CFR 1910.107(c)(6) · Spray painting and finishing
Serious$0$0Feb 12, 2016Final
Citation 1, item 2c
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$0$0Feb 12, 2016Final

Inspection 340905504 OPENED SEP 9, 2015Closed

Complaint · Partial · Safety · 28 employees at the site · Closed Feb 17, 2016

90 Main Street, Tullytown, PA 19007 · Totalizing Fluid Meter and Counting Device Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.101(b) · Compressed gases (general requirements)
Serious$4,200$2,900Oct 9, 2015Final
Citation 1, item 2a
29 CFR 1910.107(c)(5) · Spray painting and finishing
Serious$4,900$2,900Oct 9, 2015Final
Citation 1, item 2b
29 CFR 1910.307(c)(2)(i) · Hazardous (classified) locations
Serious$0$0Oct 9, 2015Final
Citation 1, item 3a
29 CFR 1910.134(c) · Respiratory protection
Serious$4,200$2,900Oct 9, 2015Final
Citation 1, item 3b
29 CFR 1910.134(e)(2)(i) · Respiratory protection
Serious$0$0Oct 9, 2015Final
Citation 1, item 3c
29 CFR 1910.134(f)(1) · Respiratory protection
Serious$0$0Oct 9, 2015Final
Citation 1, item 3d
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Oct 9, 2015Final
Citation 1, item 3e
29 CFR 1910.134(h)(1)(i) · Respiratory protection
Serious$0$0Oct 9, 2015Final
Citation 1, item 4a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$2,800$2,800Oct 9, 2015Final
Citation 1, item 4b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Oct 9, 2015Final
Citation 1, item 4c
29 CFR 1910.1200(g)(8) · Hazard communication
Serious$0$0Oct 9, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.101 · Compressed gases (general requirements)

29 CFR 1910.101(b)

(b) Compressed gases. The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks shall be in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in § 1910.6.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.307 · Hazardous (classified) locations

Other totalizing fluid meter and counting device manufacturing employers in Pennsylvania

Alert subscribers get notified of each newly cited employer in Pennsylvania the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.