OSHA SearchOSHA records by employer

Jos? L. RU?Z Valera: OSHA inspections and violations

Mayaguez, Puerto Rico · Drywall and Insulation Contractors · NAICS 238310

1inspections
4citation items
$0current penalties
Jan 10, 2023last inspection

OSHA inspectors have visited Jos? L. RU?Z Valera in Puerto Rico one time.

It opened on Jan 10, 2023, in Mayaguez.

In all, OSHA issued 4 citation items: 1 serious and 3 other-than-serious.

The proposed penalties came to $1,063; today they stand at $0, 100% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Jos? L. RU?Z Valera averages $0 across 1 cited inspection.

Jos? L. RU?Z Valera: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Puerto Rico · latest 90 days of OSHA records

108employers cited

Get notified the morning OSHA posts each new citation in Puerto Rico: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Puerto Rico

Checking a subcontractor, a client or your own company? Watch Jos? L. RU?Z Valera and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346444797 OPENED JAN 10, 2023Closed

Unprogrammed other · Complete · Safety · 4 employees at the site · Closed Apr 14, 2023

Carr. #2 Km. 159.4 Mayaguez Mall, Mayaguez, PR 00680 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,063$0Mar 3, 2023Final
Citation 2, item 1
29 CFR 6 B
Other-than-serious$0$0Mar 3, 2023Final
Citation 2, item 2
29 CFR 1926.20(b)(1) · Construction safety programs
Other-than-serious$0$0Mar 3, 2023Final
Citation 2, item 3
29 CFR 1926.452(w)(2) · Rules for each type of scaffold
Other-than-serious$0$0Mar 3, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.20(b)(1)

(b) Accident prevention responsibilities. (1) It shall be the responsibility of the employer to initiate and maintain such programs as may be necessary to comply with this part.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(w)(2)

(2) Scaffold casters and wheels shall be locked with positive wheel and/or wheel and swivel locks, or equivalent means, to prevent movement of the scaffold while the scaffold is used in a stationary manner.

Other drywall and insulation contractors employers in Puerto Rico

Alert subscribers get notified of each newly cited employer in Puerto Rico the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.