OSHA SearchOSHA records by employer

Jostin Construction, Inc.: OSHA inspections and violations

Cincinnati, Ohio · Poured Concrete Foundation and Structure Contractors · NAICS 238110

3inspections
3citation items
$20,418current penalties
Mar 12, 2024last inspection

OSHA has inspected Jostin Construction, Inc. 3 times in Ohio since 2012.

The latest one began on Mar 12, 2024 on a referral, in Cincinnati.

Those inspections ended with 3 citation items: 2 serious and 1 other-than-serious.

Penalties were first proposed at $24,318 and now stand at $20,418, 16% lower after settlements or reviews.

Construction safety programs comes up most often in these citations: 2 items under 1926.20.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Jostin Construction, Inc. averages $14,518 (1 cited inspection).

Jostin Construction, Inc. also files yearly injury logs with OSHA, summarized below.

It reported 2 severe injuries to OSHA since 2015.

Jostin Construction, Inc.: OSHA citation items per year, 2012 to 2024
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

267employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Jostin Construction, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347345480 OPENED MAR 12, 2024Closed

Referral · Partial · Safety · 12 employees at the site · Closed Apr 4, 2025

3400 Vine Street, Cincinnati, OH 45220 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.20(b)(1) · Construction safety programs
Other-than-serious$14,518$14,518Apr 12, 2024Final

Inspection 343452371 OPENED SEP 11, 2018Closed

Referral · Partial · Safety · 72 employees at the site · Closed May 15, 2019

1723 Cleneay Ave., Norwood, OH 45212 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Incident on Sep 10, 2018: Employee, struck by hose, incurs multiple injuries in fall

At 3:30 a.m. on September 10, 2018, Employee #1, employed by a construction company, was operating a concrete hose at the site of a new two-story commercial building. Concrete became clogged in the hose. As he attempted to clear the clog, the boom of the hose struck Employee #1, causing him to fall through a guardrail, a fall height of 29 feet. Emergency services transported the employee to the hospital, where he was admitted and treated for multiple injuries, including multiple rib fractures, a fractured ankle, a fractured leg, and lacerations to his head.

No citations from this inspection.

Inspection 331910174 OPENED JAN 27, 2012Closed

Fatality or catastrophe · Partial · Safety · 44 employees at the site · Closed Jul 10, 2013

401 East Court St., Cincinnati, OH 45202 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.20(b)(1) · Construction safety programs
Serious$4,900$3,400Apr 5, 2012Final
Citation 1, item 3
29 CFR 1926.501(a)(2) · Fall protection in construction
Serious$4,900$2,500Apr 5, 2012Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Cincinnati site logged 3 recordable injuries or illnesses among about 126 workers: 2.4 per 100 full-time workers, against a median of 2.8 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Jostin Construction, INC
Cincinnati · 2025
126 302.42.8
Jostin Construction
Cincinnati · 2023
108 100.92.8

Included with any plan: 3 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 2 reports on file.

Mar 4, 2024, Cincinnati: Amputation · amputations, avulsions, enucleations unspecified · other finger(s) n.e.c.

An employee was unloading a trash hopper into a dumpster using a skid steer with fork attachments when his fingers became crushed between the fork attachment and the trash hopper. This resulted in partial amputation of the index and middle fingers on the left hand.

Sep 10, 2018, Norwood: Hospitalization · fractures · multiple body parts, n.e.c.

An employee was running a concrete pump truck when the boom struck either the employee or handrail, causing the employee and handrail to fall 29 feet. The employee was hospitalized with a head laceration, five broken ribs, a broken ankle, and a fractured fibula.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.20(b)(1)

(b) Accident prevention responsibilities. (1) It shall be the responsibility of the employer to initiate and maintain such programs as may be necessary to comply with this part.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(a)(2)

(2) The employer shall determine if the walking/working surfaces on which its employees are to work have the strength and structural integrity to support employees safely. Employees shall be allowed to work on those surfaces only when the surfaces have the requisite strength and structural integrity.

Other poured concrete foundation and structure contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.