OSHA SearchOSHA records by employer

JRC Consolidate Inc: OSHA inspections and violations

Ponce, Puerto Rico · Commercial and Institutional Building Construction · NAICS 236220

2inspections
14citation items
$0current penalties
Jul 14, 2020last inspection

Since 2020, OSHA inspectors have visited JRC Consolidate Inc in Puerto Rico 2 times.

The most recent inspection opened on Jul 14, 2020 on a referral, in Ponce.

In all, OSHA issued 14 citation items: 13 serious and 1 other-than-serious.

The proposed penalties came to $38,850; today they stand at $0, 100% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 5 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. JRC Consolidate Inc averages $0 across 1 cited inspection.

JRC Consolidate Inc: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Puerto Rico · latest 90 days of OSHA records

109employers cited

8 of them in the same industry

Get notified the morning OSHA posts each new citation in Puerto Rico: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Puerto Rico

Checking a subcontractor, a client or your own company? Watch JRC Consolidate Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344939764 OPENED JUL 14, 2020Closed

Referral · Partial · Safety · 133 employees at the site · Closed Aug 10, 2020

Pr2 Km 228.9, Ponce, PR 00717 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 344645999 OPENED FEB 12, 2020Closed

Referral · Complete · Safety · 133 employees at the site · Closed Jul 20, 2021

Carretera 2 Km 228.9, Ponce, PR 00717 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.302(e)(11) · Power-operated hand tools
Serious$3,500$0Mar 31, 2020Final
Citation 1, item 2
29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites
Serious$1,750$0Mar 31, 2020Final
Citation 1, item 3
29 CFR 1926.405(a)(2)(ii)(j) · Job-site wiring
Serious$3,500$0Mar 31, 2020Final
Citation 1, item 4
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$3,500$0Mar 31, 2020Final
Citation 1, item 5
29 CFR 1926.451(c)(2)(iii) · Scaffolds, general requirements
Serious$2,450$0Mar 31, 2020Final
Citation 1, item 6
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Serious$2,450$0Mar 31, 2020Final
Citation 1, item 7a
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$2,450$0Mar 31, 2020Final
Citation 1, item 7b
29 CFR 1926.451(f)(4) · Scaffolds, general requirements
Serious$0$0Mar 31, 2020Final
Citation 1, item 8
29 CFR 1926.454(a) · Scaffold training
Serious$2,450$0Mar 31, 2020Final
Citation 1, item 9
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$4,900$0Mar 31, 2020Final
Citation 1, item 10
29 CFR 1926.502(b)(1) · Fall protection systems
Serious$4,900$0Mar 31, 2020Final
Citation 1, item 11
29 CFR 1926.502(b)(2) · Fall protection systems
Serious$3,500$0Mar 31, 2020Final
Citation 1, item 12
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$3,500$0Mar 31, 2020Final
Citation 2, item 1
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Other-than-serious$0$0Mar 31, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.302 · Power-operated hand tools

29 CFR 1926.302(e)(11)

(11) All tools shall be used with the correct shield, guard, or attachment recommended by the manufacturer.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(ii)

(ii) Ground-fault circuit interrupters. All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)(j)

(J) Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.503 · Fall protection training in construction

Other commercial and institutional building construction employers in Puerto Rico

Alert subscribers get notified of each newly cited employer in Puerto Rico the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.