OSHA SearchOSHA records by employer

Kalcon LLC: OSHA inspections and violations

Saint Paul, Minnesota · Commercial and Institutional Building Construction · NAICS 236220

4inspections
7citation items
$988current penalties
May 4, 2022last inspection

Since 2017, OSHA inspectors have visited Kalcon LLC in Minnesota 4 times.

The most recent inspection opened on May 4, 2022 as a planned inspection, in Saint Paul.

In all, OSHA issued 7 citation items: 3 serious and 4 other-than-serious.

The proposed penalties came to $1,575; today they stand at $988, 37% less.

The rule cited most here is 1926.405 (job-site wiring), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Kalcon LLC averages $494 across 2 cited inspections.

Kalcon LLC: OSHA citation items per year, 2017 to 2022
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

380employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Kalcon LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345943187 OPENED MAY 4, 2022Closed

Planned · Complete · Safety · 2 employees at the site · Closed Dec 14, 2022

160 Wabasha St S, Saint Paul, MN 55107 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Serious$450$270Jun 30, 2022Final
Citation 1, item 2
29 CFR 1926.850(a) · Preparatory operations
Serious$450$270Jun 30, 2022Final
Citation 2, item 1
29 CFR 1926.405(a)(2)(ii)(i) · Job-site wiring
Other-than-serious$150$90Jun 30, 2022Final
Citation 2, item 2 Other-than-serious$100$60Jun 30, 2022Final

Inspection 345263123 OPENED APR 8, 2021Closed

Planned · Complete · Safety · 1 employee at the site · Closed Jun 10, 2021

107 Chestnut St, Stillwater, MN 55082 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1052(c)(1) · Stairways in construction
Serious$225$158May 11, 2021Final
Citation 2, item 1
29 CFR 1926.403(e) · Electrical equipment on job sites
Other-than-serious$100$70May 11, 2021Final
Citation 2, item 2
29 CFR 1926.405(g)(1)(iii) · Job-site wiring
Other-than-serious$100$70May 11, 2021Final

Inspection 342769395 OPENED OCT 25, 2017Closed

Planned · No inspection · Safety · 3 employees at the site · Closed Nov 16, 2017

928 W 7th St, Saint Paul, MN 55102 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 342741360 OPENED OCT 24, 2017Closed

Unprogrammed related · Partial · Safety · 3 employees at the site · Closed Nov 2, 2017

928 W 7th Street, Saint Paul, MN 55102 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)

(1) Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, shall be equipped with:

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.850 · Preparatory operations

29 CFR 5207.35

Other commercial and institutional building construction employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.