Inspection 348620881 OPENED NOV 17, 2025Closed
2551 23rd Ave, Forest Grove, OR 97116 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Saint Helens, Oregon · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115
Since 2023, OSHA inspectors have visited LDH Construction LLC in Oregon 3 times.
The most recent inspection opened on Nov 17, 2025 as a planned inspection, in Forest Grove.
In all, OSHA issued 15 citation items: 10 serious and 5 other-than-serious.
The penalties, $1,655 in total, stand where OSHA first set them.
The rule cited most here is 1910.303 (electrical equipment, general requirements), 3 times.
Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. LDH Construction LLC averages $1,655 across 1 cited inspection.
Oregon · latest 90 days of OSHA records
384employers cited
15 of them in the same industry
Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Oregon
Checking a subcontractor, a client or your own company? Watch LDH Construction LLC and get notified the morning OSHA posts a new citation for it.
Watch this company2551 23rd Ave, Forest Grove, OR 97116 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
31692 Pittsburgh Rd, Saint Helens, OR 97051 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
31692 Pittsburgh Rd, Saint Helens, OR 97051 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR OAR 437-001-0765(1) |
Serious | $100 | $100 | May 5, 2023 | Final |
| Citation 1, item 2 29 CFR 1910.305(d)(2) · Electrical wiring methods |
Serious | $100 | $100 | May 5, 2023 | Final |
| Citation 1, item 3a 29 CFR OAR 437-002-2102(1)(E)(B)(II) |
Serious | $185 | $185 | May 5, 2023 | Final |
| Citation 1, item 3b 29 CFR OAR 437-002-2102(1)(C)(A)(II) |
Serious | $0 | $0 | May 5, 2023 | Final |
| Citation 1, item 4 29 CFR OAR 437-002-2102(1)(E)(A)(II) |
Serious | $100 | $100 | May 5, 2023 | Final |
| Citation 1, item 5 29 CFR 1910.219(e)(1)(i) · Belts, pulleys and power-transmission parts |
Serious | $535 | $535 | May 5, 2023 | Final |
| Citation 1, item 6 29 CFR 1910.178(l)(1)(ii) · Forklifts and other powered industrial trucks |
Serious | $100 | $100 | May 5, 2023 | Final |
| Citation 1, item 7a 29 CFR 1910.184(i)(1) · Slings |
Serious | $535 | $535 | May 5, 2023 | Final |
| Citation 1, item 7b 29 CFR 1910.184(i)(9)(ii) · Slings |
Serious | $0 | $0 | May 5, 2023 | Final |
| Citation 1, item 7c 29 CFR 1910.184(i)(9)(iii) · Slings |
Serious | $0 | $0 | May 5, 2023 | Final |
| Citation 2, item 8 29 CFR OAR 437-004-2860(8) |
Other-than-serious | $0 | $0 | May 5, 2023 | Final |
| Citation 2, item 9 29 CFR 1910.305(g)(1)(iv)(a) · Electrical wiring methods |
Other-than-serious | $0 | $0 | May 5, 2023 | Final |
| Citation 2, item 10 29 CFR 1910.303(b)(7) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | May 5, 2023 | Final |
| Citation 2, item 11 29 CFR 1910.303(b)(7)(i) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | May 5, 2023 | Final |
| Citation 2, item 12 29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | May 5, 2023 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.178(l)(1)(ii)
(ii) Prior to permitting an employee to operate a powered industrial truck (except for training purposes), the employer shall ensure that each operator has successfully completed the training required by this paragraph (l), except as permitted by paragraph (l)(5).
29 CFR 1910.184(i)(1)
(i) Synthetic web slings—(1) Sling identification. Each sling shall be marked or coded to show the rated capacities for each type of hitch and type of synthetic web material.
29 CFR 1910.184(i)(9)(ii)
(ii) Melting or charring of any part of the sling surface;
Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.