Madrid Masonry has 9 OSHA inspections on record in Texas, the first in 1992.
OSHA's last visit started on Jun 12, 2024 as a planned inspection, in Lubbock, and the case has not closed yet.
Across those inspections OSHA issued 40 citation items: 34 serious, 1 repeat and 5 other-than-serious.
OSHA proposed $98,488 in penalties. After settlements and reviews the total is $72,819, down 26%.
Most often, OSHA cited 1926.451, scaffolds, general requirements (20 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Madrid Masonry averages $11,054 over 5 cited inspections in that time.
It reported 1 severe injury to OSHA since 2015.
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
May 5, 2016, Lubbock: Hospitalization · fractures · multiple body parts, n.e.c.
Two employees were working on a scaffolding system that toppled over injuring both employees on May 5, 2016, at approximately 0930 hours. One employee fell directly onto a small structure near the scaffold and suffered a broken pelvis, shoulder, ribs, and wrist on his right side. The employee was hospitalized for treatment of his injuries. The second employee fell directly on the bare ground and…
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.