OSHA SearchOSHA records by employer

Maruichi Leavitt Pipe & Tube, LLC: OSHA inspections and violations

Chicago, Illinois · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · NAICS 331210

6inspections
7citation items
$44,969current penalties
Jan 23, 2019last inspection

Maruichi Leavitt Pipe & Tube, LLC has 6 OSHA inspections on record in Illinois, the first in 2014.

OSHA's last visit started on Jan 23, 2019 after a complaint, in Chicago.

Across those inspections OSHA issued 7 citation items: 7 serious.

OSHA proposed $52,242 in penalties. After settlements and reviews the total is $44,969, down 14%.

Most often, OSHA cited 1910.147, lockout/tagout (4 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Maruichi Leavitt Pipe & Tube, LLC averages $8,485 over 2 cited inspections in that time.

1 inspection on this page followed a fatal incident.

Maruichi Leavitt Pipe & Tube, LLC also files yearly injury logs with OSHA, summarized below.

Maruichi Leavitt Pipe & Tube, LLC: OSHA citation items per year, 2014 to 2019
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

417employers cited

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Maruichi Leavitt Pipe & Tube, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343740395 OPENED JAN 23, 2019Closed

Complaint · Partial · Safety · 120 employees at the site · Closed Aug 2, 2019

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.179(e)(2)(i) · Overhead and gantry cranes
Serious$9,377$6,564Jul 16, 2019Final
Citation 1, item 2
29 CFR 1910.179(j)(2) · Overhead and gantry cranes
Serious$9,377$6,564Jul 16, 2019Final

Inspection 343477667 OPENED SEP 20, 2018Closed

Complaint · Partial · Safety · 120 employees at the site · Closed Nov 5, 2018

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343017802 OPENED MAR 13, 2018Closed

Complaint · Partial · Safety · 100 employees at the site · Closed Jun 22, 2018

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.178(l)(4)(iii) · Forklifts and other powered industrial trucks
Serious$5,488$3,842May 23, 2018Final

Inspection 340035914 OPENED OCT 23, 2014Open

Follow-up · Partial · Safety · Open

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

No citations from this inspection so far.

Inspection 340036243 OPENED OCT 23, 2014Closed

Follow-up · Partial · Safety · 138 employees at the site · Closed Oct 23, 2014

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 339571838 OPENED JAN 31, 2014Closed

Fatality or catastrophe · Partial · Safety · 138 employees at the site · Closed Oct 23, 2014

1717 W. 115th Street, Chicago, IL 60643 · Iron and Steel Pipe and Tube Manufacturing from Purchased Steel · OSHA's record · Phone and website on Google Maps

Incident on Jan 31, 2014 (fatal): Employee is caught in machine and killed

At 2:30 a.m. on January 31, 2014, an employee was working with three other coworkers at the W50 Mill producing one and one half inch square steel tubing, twenty-four feet in length. The W50 Mill runs the length of the building and consists of four work stations. A jam occurred in the Mill section of the process. When the jam occurred the W50 Mill had to be rethreaded. Rethreading of the W50 Mill consists of using new steel tubing along with drives to push out the jammed steel square tubing. The jammed steel square tubing traveled just beyond an area on the W50 Mill where there are no more drves to assist in pushing out the old steel square tubing. To assist in the removal of the jammed steel square tubing, the employee entered alone into the gated station of the cut-off saw. The employee manually pulled on the jammed steel square tubing to align it to go through the jaws of the cut-off saw for removal. The cut-off saw moved and struck/crushed the employee. Employee was caught between the carriage of the cutoff saw and the rail stop and was killed.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$7,000$7,000Jul 24, 2014Final
Citation 1, item 2
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Serious$7,000$7,000Jul 24, 2014Final
Citation 1, item 3
29 CFR 1910.147(c)(7)(i)(a) · Lockout/tagout
Serious$7,000$7,000Jul 24, 2014Final
Citation 1, item 4
29 CFR 1910.147(d)(4)(i) · Lockout/tagout
Serious$7,000$7,000Jul 24, 2014Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Chicago site logged 8 recordable injuries or illnesses among about 130 workers: 5.6 per 100 full-time workers, against a median of 3.6 for its industry. Those cases cost 137 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Maruichi-Leavitt Pipe and Tube
Chicago · 2025
130 835.63.6
Maruichi Leavitt Pipe & Tube LLC
Chicago · 2019
114 1058.43.6

Included with any plan: 8 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(ii)

(ii) The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:

29 CFR 1910.147(c)(6)(ii)

(ii) The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.

29 CFR 1910.147(c)(7)(i)(a)

(A) Each authorized employee shall receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control.

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.179 · Overhead and gantry cranes

Other iron and steel pipe and tube manufacturing from purchased steel employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.