OSHA SearchOSHA records by employer

Metro Ready Mix LLC: OSHA inspections and violations

West Valley City, Utah · Ready-Mix Concrete Manufacturing · NAICS 327320

2inspections
5citation items
$1,050current penalties
Jun 18, 2015last inspection

Since 2006, OSHA inspectors have visited Metro Ready Mix LLC in Utah 2 times.

The most recent inspection opened on Jun 18, 2015 after an accident, in Lehi.

In all, OSHA issued 5 citation items: 3 serious and 2 other-than-serious.

The proposed penalties came to $2,250; today they stand at $1,050, 53% less.

The rule cited most here is 1910.147 (lockout/tagout), 3 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Metro Ready Mix LLC averages $250 across 1 cited inspection.

Metro Ready Mix LLC: OSHA citation items per year, 2006 to 2015
Citation items per year, by inspection date.

Utah · latest 90 days of OSHA records

67employers cited

Get notified the morning OSHA posts each new citation in Utah: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Utah

Checking a subcontractor, a client or your own company? Watch Metro Ready Mix LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340733161 OPENED JUN 18, 2015Closed

Accident · Partial · Safety · 100 employees at the site · Closed Sep 8, 2015

Triumph Road Hwy 92, Lehi, UT 84043 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1904.29(a) · Injury and illness log
Other-than-serious$250$250Jul 8, 2015Final

Inspection 309166262 OPENED JAN 4, 2006Closed

Accident · Partial · Safety · 53 employees at the site · Closed Feb 1, 2006

7000 West 5400 South, West Valley City, UT 84119 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(2)(ii) · Lockout/tagout
Serious$1,500$600Jan 18, 2006Closed
Citation 1, item 1b
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$0$0Jan 18, 2006Closed
Citation 1, item 1c
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Jan 18, 2006Closed
Citation 2, item 1
29 CFR 10005 C02
Other-than-serious$500$200Jan 18, 2006Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1904.29 · Injury and illness log

29 CFR 1904.29(a)

(a) Basic requirement. You must use OSHA 300, 300-A, and 301 forms, or equivalent forms, for recordable injuries and illnesses. The OSHA 300 form is called the Log of Work-Related Injuries and Illnesses, the 300-A is the Summary of Work-Related Injuries and Illnesses, and the OSHA 301 form is called the Injury and Illness Incident Report.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(2)(ii)

(ii) If an energy isolating device is capable of being locked out, the employer's energy control program under paragraph (c)(1) of this section shall utilize lockout, unless the employer can demonstrate that the utilization of a tagout system will provide full employee protection as set forth in paragraph (c)(3) of this section.

29 CFR 1910.147(c)(4)(ii)

(ii) The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:

Other ready-mix concrete manufacturing employers in Utah

Alert subscribers get notified of each newly cited employer in Utah the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.