OSHA SearchOSHA records by employer

Muniz Concrete and Contracting, Inc.: OSHA inspections and violations

Austin, Texas · Poured Concrete Foundation and Structure Contractors · NAICS 238110

4inspections
6citation items
$6,450current penalties
Apr 28, 2016last inspection

Muniz Concrete and Contracting, Inc. has 4 OSHA inspections on record in Texas, the first in 1997.

OSHA's last visit started on Apr 28, 2016 as a planned inspection, in Austin.

Across those inspections OSHA issued 6 citation items: 6 serious.

OSHA proposed $9,400 in penalties. After settlements and reviews the total is $6,450, down 31%.

Most often, OSHA cited 1926.651, excavations (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Muniz Concrete and Contracting, Inc. averages $5,250 over 1 cited inspection in that time.

Muniz Concrete and Contracting, Inc. also files yearly injury logs with OSHA, summarized below.

Muniz Concrete and Contracting, Inc.: OSHA citation items per year, 1997 to 2016
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

399employers cited

6 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Muniz Concrete and Contracting, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341441178 OPENED APR 28, 2016Closed

Planned · Partial · Safety · 3 employees at the site · Closed Nov 13, 2017

Colorado Street 7th To 8th Steet, Austin, TX 78701 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 340500420 OPENED MAR 30, 2015Closed

Unprogrammed related · Partial · Health · 2 employees at the site · Closed Aug 10, 2015

1033 La Posada Drive, Austin, TX 78752 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.134(a)(1) · Respiratory protection
Serious$3,500$5,250Jun 23, 2015Final
Citation 1, item 1b
29 CFR 1926.20(b)(2) · Construction safety programs
Serious$3,500$0Jun 23, 2015Final

Inspection 300431160 OPENED APR 16, 1997Closed

Follow-up · No inspection · Safety · Closed Apr 17, 1997

Oltorf And Congress, Austin, TX 78763 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 123485740 OPENED MAR 3, 1997Closed

Referral · Partial · Safety · 12 employees at the site · Closed Apr 18, 1997

Oltorf And Congress, Austin, TX 78763 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(c)(2) · Excavations
Serious$450$225Mar 20, 1997Closed
Citation 1, item 2
29 CFR 1926.651(j)(2) · Excavations
Serious$450$225Mar 20, 1997Closed
Citation 1, item 3
29 CFR 1926.652(a)(1) · Trench protection
Serious$750$375Mar 20, 1997Closed
Citation 1, item 4
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$750$375Mar 20, 1997Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Austin site logged 0 recordable injuries or illnesses among about 45 workers: 0.0 per 100 full-time workers, against a median of 2.2 for its industry.

Site and yearWorkersCasesDays-away casesRateIndustry median
Muniz Concrete & Contracting, Inc.
Austin · 2025
45 000.02.2

Included with any plan: 5 more yearly logs from these sites, back to 2019, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(1)

(1) The instrument shall have a non-adjustable test pressure of 15.0 mm water pressure.

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.20(b)(2)

(2) Such programs shall provide for frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers.

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.652 · Trench protection

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other poured concrete foundation and structure contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.