OSHA SearchOSHA records by employer

Next Air & Gas, LLC: OSHA inspections and violations

Lenoir City, Tennessee · Engineering Services · NAICS 541330

1inspections
14citation items
$1,625current penalties
Jan 31, 2023last inspection

OSHA inspectors have visited Next Air & Gas, LLC in Tennessee one time.

It opened on Jan 31, 2023 after a complaint, in Lenoir City.

In all, OSHA issued 14 citation items: 14 serious.

The proposed penalties came to $2,500; today they stand at $1,625, 35% less.

The rule cited most here is 1910.107 (spray painting and finishing), 5 times.

Among professional services employers, the typical cited inspection since 2015 ends with a $1,820 penalty. Next Air & Gas, LLC averages $1,625 across 1 cited inspection.

Next Air & Gas, LLC: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

321employers cited

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Next Air & Gas, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 346615552 OPENED JAN 31, 2023Closed

Complaint · Partial · Health · 25 employees at the site · Closed Dec 13, 2023

991 Gladstone Road, Lenoir City, TN 37771 · Engineering Services · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$600$0Jul 25, 2023Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$0$0Jul 25, 2023Final
Citation 1, item 1c
29 CFR 1910.107(b)(9) · Spray painting and finishing
Serious$0$0Jul 25, 2023Final
Citation 1, item 1d
29 CFR 1910.107(d)(7) · Spray painting and finishing
Serious$0$0Jul 25, 2023Final
Citation 1, item 1e
29 CFR 1910.107(g)(7) · Spray painting and finishing
Serious$0$0Jul 25, 2023Final
Citation 1, item 2a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$500$225Jul 25, 2023Final
Citation 1, item 2b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Jul 25, 2023Final
Citation 1, item 2c
29 CFR 1910.134(h)(2)(i) · Respiratory protection
Serious$0$0Jul 25, 2023Final
Citation 1, item 2d
29 CFR 1910.134(k)(3) · Respiratory protection
Serious$0$0Jul 25, 2023Final
Citation 1, item 3
29 CFR 1910.243(c)(3) · Guarding of portable powered tools
Serious$400$400Jul 25, 2023Final
Citation 1, item 4a
29 CFR 1910.252(a)(1)(i) · Welding fire safety
Serious$500$500Jul 25, 2023Final
Citation 1, item 4b
29 CFR 1910.252(b)(2)(i)(a) · Welding fire safety
Serious$0$0Jul 25, 2023Final
Citation 1, item 5a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$500$500Jul 25, 2023Final
Citation 1, item 5b
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Jul 25, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.107(b)(9)

(9) Cleaning. Spray booths shall be so installed that all portions are readily accessible for cleaning. A clear space of not less than 3 feet on all sides shall be kept free from storage or combustible construction.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.243 · Guarding of portable powered tools

29 CFR 1910.252 · Welding fire safety

Other engineering services employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.