OSHA SearchOSHA records by employer

Norman Saucier: OSHA inspections and violations

Westborough, Massachusetts · Structural Steel and Precast Concrete Contractors · NAICS 238120

1inspections
3citation items
$1,989current penalties
Mar 12, 2019last inspection

OSHA inspectors have visited Norman Saucier in Massachusetts one time.

It opened on Mar 12, 2019 as a planned inspection, in Westborough.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $7,956; today they stand at $1,989, 75% less.

The rule cited most here is 1926.351 (arc welding and cutting), 3 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Norman Saucier averages $1,989 across 1 cited inspection.

Norman Saucier: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

235employers cited

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch Norman Saucier and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343855011 OPENED MAR 12, 2019Closed

Planned · Partial · Safety · 2 employees at the site · Closed Aug 28, 2019

9 Technology Dr, Westborough, MA 01582 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.351(b)(2) · Arc welding and cutting
Serious$3,978$1,989May 23, 2019Final
Citation 1, item 1b
29 CFR 1926.351(b)(4) · Arc welding and cutting
Serious$0$0May 23, 2019Final
Citation 1, item 1c
29 CFR 1926.351(d) · Arc welding and cutting
Serious$3,978$0May 23, 2019Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.351 · Arc welding and cutting

29 CFR 1926.351(b)(2)

(2) Only cable free from repair or splices for a minimum distance of 10 feet from the cable end to which the electrode holder is connected shall be used, except that cables with standard insulated connectors or with splices whose insulating quality is equal to that of the cable are permitted.

29 CFR 1926.351(b)(4)

(4) Cables in need of repair shall not be used. When a cable, other than the cable lead referred to in paragraph (b)(2) of this section, becomes worn to the extent of exposing bare conductors, the portion thus exposed shall be protected by means of rubber and friction tape or other equivalent insulation.

29 CFR 1926.351(d)

(d) Operating instructions. Employers shall instruct employees in the safe means of arc welding and cutting as follows:

Other structural steel and precast concrete contractors employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.