OSHA has inspected Northern Wire LLC 15 times in Wisconsin since 1978.
The latest one began on Mar 15, 2017 after a complaint, in Merrill.
Those inspections ended with 54 citation items: 24 serious, 1 repeat and 29 other-than-serious.
Penalties were first proposed at $32,800 and now stand at $15,960, 51% lower after settlements or reviews.
Mechanical power presses comes up most often in these citations: 20 items under 1910.217.
How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $3,600, and Northern Wire LLC averages $0 (1 cited inspection).
Northern Wire LLC also files yearly injury logs with OSHA, summarized below.
Citation items per year, by inspection date.
Wisconsin · latest 90 days of OSHA records
229employers cited
Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Merrill site logged 6 recordable injuries or illnesses among about 66 workers: 8.5 per 100 full-time workers, against a median of 3.3 for its industry. Those cases cost 98 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
Northern Wire
Merrill · 2024
66
6
4
8.5
3.3
Northern Wire LLC
Merrill · 2017
161
17
1
9.2
3.3
Included with any plan: 6 more yearly logs from these sites, back to 2017, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(2) Initial monitoring. (i) Each employer who has a workplace or work operation covered by this standard, except as provided for in paragraphs (d)(2)(ii) and (d)(2)(iii) of this section, shall perform initial monitoring of employees who are, or may reasonably be expected to be exposed to airborne concentrations at or above the TWA permissible exposure limit and/or excursion limit.
(4) Design and construction of inside storage rooms—(i) Construction. Inside storage rooms shall be constructed to meet the required fire-resistive rating for their use. Such construction shall comply with the test specifications set forth in Standard Methods of Fire Tests of Building Construction and Materials, NFPA 251-1969. Where an automatic sprinkler system is provided, the system shall be designed and installed in an acceptable manner. Openings to other rooms or buildings shall be provided with noncombustible liquid-tight raised sills or ramps at least 4 inches in height, or the floor in the storage area shall be at least 4 inches below the surrounding floor. Openings shall be provided with approved self-closing fire doors. The room shall be liquid-tight where the walls join the floor. A permissible alternate to the sill or ramp is an open-grated trench inside of the room which dra
Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.