OSHA SearchOSHA records by employer

Paragon Plastering, Inc.: OSHA inspections and violations

Panama City, Florida · Drywall and Insulation Contractors · NAICS 238310

3inspections
9citation items
$9,540current penalties
Jun 30, 2015last inspection

OSHA has inspected Paragon Plastering, Inc. 3 times in Florida since 2006.

The latest one began on Jun 30, 2015 as a planned inspection, in Panama City.

Those inspections ended with 9 citation items: 6 serious, 1 repeat and 2 other-than-serious.

Penalties were first proposed at $14,900 and now stand at $9,540, 36% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 7 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Paragon Plastering, Inc. averages $2,940 (1 cited inspection).

Paragon Plastering, Inc.: OSHA citation items per year, 2006 to 2015
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

333employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Paragon Plastering, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340744549 OPENED JUN 30, 2015Closed

Planned · Complete · Safety · 9 employees at the site · Closed Aug 11, 2015

Baldwin St, Panama City, FL 32405 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1)(v) · Scaffolds, general requirements
Serious$4,900$2,940Aug 4, 2015Final

Inspection 311816086 OPENED MAY 28, 2008Closed

Planned · Complete · Safety · 3 employees at the site · Closed Dec 30, 2008

5230 W Highway 98, Panama City, FL 32401 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Repeat$4,000$2,400Jun 27, 2008Closed

Inspection 310028279 OPENED OCT 25, 2006Closed

Planned · Complete · Safety · 3 employees at the site · Closed Mar 12, 2007

17633 Ashley Drive, Panama City Beach, FL 32408 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$1,500$1,050Nov 6, 2006Closed
Citation 1, item 2
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$750$525Nov 6, 2006Closed
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$1,500$1,050Nov 6, 2006Closed
Citation 1, item 4
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$750$525Nov 6, 2006Closed
Citation 1, item 5
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$1,500$1,050Nov 6, 2006Closed
Citation 2, item 1
29 CFR 1926.20(b)(1) · Construction safety programs
Other-than-serious$0$0Nov 6, 2006Closed
Citation 2, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Nov 6, 2006Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1926.20 · Construction safety programs

29 CFR 1926.20(b)(1)

(b) Accident prevention responsibilities. (1) It shall be the responsibility of the employer to initiate and maintain such programs as may be necessary to comply with this part.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)(i)

(i) Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).

Other drywall and insulation contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.