OSHA SearchOSHA records by employer

Paragon Store Fixtures Inc: OSHA inspections and violations

Big Lake, Minnesota · Custom Architectural Woodwork and Millwork Manufacturing · NAICS 337212

6inspections
19citation items
$6,380current penalties
Aug 20, 2025last inspection

Paragon Store Fixtures Inc has 6 OSHA inspections on record in Minnesota, the first in 2005.

OSHA's last visit started on Aug 20, 2025 as a planned inspection, in Big Lake.

Across those inspections OSHA issued 19 citation items: 15 serious and 4 other-than-serious.

OSHA proposed $7,100 in penalties. After settlements and reviews the total is $6,380, down 10%.

Most often, OSHA cited 5206.700, (2 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $3,600. Paragon Store Fixtures Inc averages $1,280 over 2 cited inspections in that time.

Paragon Store Fixtures Inc: OSHA citation items per year, 2005 to 2025
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

371employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Paragon Store Fixtures Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348452673 OPENED AUG 20, 2025Closed

Planned · Complete · Safety · 55 employees at the site · Closed Nov 19, 2025

20020 176th St Nw, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(d)(3)(iii)(b)(2) · Respiratory protection
Serious$800$800Sep 2, 2025Final
Citation 1, item 2
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$600$600Sep 2, 2025Final
Citation 1, item 3
29 CFR 1910.212(a)(1) · Machine guarding
Serious$600$600Sep 2, 2025Final

Inspection 342669397 OPENED SEP 26, 2017Closed

Planned · Complete · Safety · 33 employees at the site · Closed Nov 6, 2017

20020 176th St Nw, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.110(e)(4)(iii) · Storage and handling of liquefied petroleum gases
Serious$300$210Oct 13, 2017Final
Citation 1, item 2
29 CFR 1910.212(a)(1) · Machine guarding
Serious$300$210Oct 13, 2017Final
Citation 2, item 1 Other-than-serious$100$70Oct 13, 2017Final
Citation 2, item 2 Other-than-serious$100$70Oct 13, 2017Final

Inspection 317031615 OPENED MAR 25, 2013Closed

Planned · Complete · Health · 47 employees at the site · Closed May 20, 2013

20020 176th St Nw, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.1026(l)(1) · Hexavalent chromium
Serious$400$400Apr 8, 2013Closed
Citation 1, item 2 Serious$400$400Apr 8, 2013Closed
Citation 1, item 3 Serious$400$400Apr 8, 2013Closed

Inspection 312833676 OPENED JAN 15, 2009Closed

Referral · Partial · Health · 30 employees at the site · Closed Feb 10, 2009

20020 176th St, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 312833072 OPENED JAN 8, 2009Closed

Planned · Complete · Safety · 57 employees at the site · Closed Apr 3, 2009

20020 176th St, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.213(c)(2) · Woodworking machinery
Serious$300$210Jan 27, 2009Closed
Citation 1, item 1b
29 CFR 1910.213(c)(3) · Woodworking machinery
Serious$0$0Jan 27, 2009Closed
Citation 1, item 2
29 CFR 1910.215(a)(4) · Grinders and abrasive wheels
Serious$300$210Jan 27, 2009Closed
Citation 1, item 3
29 CFR 1910.303(b)(1) · Electrical equipment, general requirements
Serious$300$210Jan 27, 2009Closed
Citation 1, item 4
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$600$420Jan 27, 2009Closed
Citation 2, item 1
29 CFR 1910.178(q)(7) · Forklifts and other powered industrial trucks
Other-than-serious$100$70Jan 27, 2009Closed

Inspection 308565324 OPENED JAN 5, 2005Closed

Planned · Complete · Health · 30 employees at the site · Closed Apr 12, 2005

20020 176th St, Big Lake, MN 55309 · Custom Architectural Woodwork and Millwork Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$600$600Mar 23, 2005Closed
Citation 1, item 2 Serious$600$600Mar 23, 2005Closed
Citation 2, item 1
29 CFR 1910.134(a)(2) · Respiratory protection
Other-than-serious$300$300Mar 23, 2005Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1026 · Hexavalent chromium

29 CFR 1910.1026(l)(1)

(l) Communication of chromium (VI) hazards to employees—(1) Hazard communication—general—(i) Chemical manufacturers, importers, distributors and employers shall comply with all requirements of the Hazard Communication Standard (HCS) (§ 1910.1200) for chromium (VI).

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(e)(4)(iii)

(iii) Permanent and removable fuel containers shall be securely mounted to prevent jarring loose, slipping, or rotating, and the fastenings shall be designed and constructed to withstand static loading in any direction equal to twice the weight of the tank and attachments when filled with fuel using a safety factor of not less than four based on the ultimate strength of the material to be used. Field welding, when necessary, shall be made only on saddle plates, lugs or brackets, originally attached to the container by the tank manufacturer.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.178 · Forklifts and other powered industrial trucks

29 CFR 1910.212 · Machine guarding

29 CFR 1910.213 · Woodworking machinery

29 CFR 1910.215 · Grinders and abrasive wheels

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.95 · Noise

29 CFR 5205.116

29 CFR 5205.1200

29 CFR 5206.700

Other custom architectural woodwork and millwork manufacturing employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.