Inspection 345919120 OPENED APR 20, 2022Closed
33 Lewittes Rd, Taylorsville, NC 28681 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Taylorsville, North Carolina · Plastics Plumbing Fixture Manufacturing · NAICS 326191
Since 2021, OSHA inspectors have visited Piedmont Composites - Tooling, LLC in North Carolina 2 times.
The most recent inspection opened on Apr 20, 2022 to follow up on an earlier case, in Taylorsville.
In all, OSHA issued 20 citation items: 8 serious and 12 other-than-serious.
The proposed penalties came to $4,125; today they stand at $2,677, 35% less.
The rule cited most here is 1910.1200 (hazard communication), 4 times.
Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Piedmont Composites - Tooling, LLC averages $2,677 across 1 cited inspection.
North Carolina · latest 90 days of OSHA records
228employers cited
Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in North Carolina
Checking a subcontractor, a client or your own company? Watch Piedmont Composites - Tooling, LLC and get notified the morning OSHA posts a new citation for it.
Watch this company33 Lewittes Rd, Taylorsville, NC 28681 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
33 Lewittes Rd, Taylorsville, NC 28681 · Plastics Plumbing Fixture Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.106(e)(2)(ii)(b)(2) · Flammable liquids |
Serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 1, item 2 29 CFR 1910.106(e)(2)(iv)(d) · Flammable liquids |
Serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 1, item 3a 29 CFR 1910.107(c)(5) · Spray painting and finishing |
Serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 1, item 3b 29 CFR 1910.107(g)(2) · Spray painting and finishing |
Serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 1, item 4 29 CFR 1910.213(d)(1) · Woodworking machinery |
Serious | $750 | $487 | Aug 10, 2021 | Final |
| Citation 1, item 5 29 CFR 1910.215(b)(9) · Grinders and abrasive wheels |
Serious | $450 | $292 | Aug 10, 2021 | Final |
| Citation 1, item 6 29 CFR 1910.243(c)(1) · Guarding of portable powered tools |
Serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 1, item 7 29 CFR 1910.304(g)(5) · Grounding and circuit protection |
Serious | $750 | $487 | Aug 10, 2021 | Final |
| Citation 2, item 1a 29 CFR 1904.29(b)(2) · Injury and illness log |
Other-than-serious | $150 | $97 | Aug 10, 2021 | Final |
| Citation 2, item 1b 29 CFR 1904.29(b)(3) · Injury and illness log |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 2, item 2 29 CFR 1910.22(a)(2) · Walking-working surfaces |
Other-than-serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 2, item 3a 29 CFR 1910.22(d)(2) · Walking-working surfaces |
Other-than-serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 2, item 3b 29 CFR 1910.29(f)(4) · Fall protection systems in general industry |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 2, item 4 29 CFR 1910.36(d)(1) · Exit route design |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 2, item 5 29 CFR 1910.134(c)(2)(i) · Respiratory protection |
Other-than-serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 2, item 6 29 CFR 1910.157(c)(1) · Portable fire extinguishers |
Other-than-serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 2, item 7a 29 CFR 1910.1200(e)(1) · Hazard communication |
Other-than-serious | $225 | $146 | Aug 10, 2021 | Final |
| Citation 2, item 7b 29 CFR 1910.1200(e)(1)(i) · Hazard communication |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 2, item 7c 29 CFR 1910.1200(e)(1)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
| Citation 2, item 7d 29 CFR 1910.1200(f)(6)(ii) · Hazard communication |
Other-than-serious | $0 | $0 | Aug 10, 2021 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1904.29(b)(2)
(2) What do I need to do to complete the OSHA 301 Incident Report? You must complete an OSHA 301 Incident Report form, or an equivalent form, for each recordable injury or illness entered on the OSHA 300 Log.
29 CFR 1904.29(b)(3)
(3) How quickly must each injury or illness be recorded? You must enter each recordable injury or illness on the OSHA 300 Log and 301 Incident Report within seven (7) calendar days of receiving information that a recordable injury or illness has occurred.
29 CFR 1910.106(e)(2)(ii)(b)(2)
(ii) Containers. Flammable liquids shall be stored in tanks or closed containers.
Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.