OSHA SearchOSHA records by employer

Pilot Thomas Logistics, LLC: OSHA inspections and violations

Pecos, Texas · Support Activities for Oil and Gas Operations · NAICS 213112

3inspections
3citation items
$7,000current penalties
Jan 24, 2022last inspection

OSHA has inspected Pilot Thomas Logistics, LLC 3 times in Texas since 2021.

The latest one began on Jan 24, 2022 after a fatality or catastrophe, in Orla.

Those inspections ended with 3 citation items: 3 other-than-serious.

Penalties were first proposed at $25,278 and now stand at $7,000, 72% lower after settlements or reviews.

How that compares: the median penalty per cited inspection for mining and oil and gas employers since 2015 is $2,886, and Pilot Thomas Logistics, LLC averages $3,500 (2 cited inspections).

1 inspection on this page followed a fatal incident.

Pilot Thomas Logistics, LLC: OSHA citation items per year, 2021 to 2022
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

391employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Pilot Thomas Logistics, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345742878 OPENED JAN 24, 2022Closed

Fatality or catastrophe · Partial · Safety · 25 employees at the site · Closed Aug 23, 2023

Valkyrie State 57-2-40 Unit 13ha, Orla, TX 79770 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

Incident on Jan 21, 2022 (fatal): Employee is found dead in tractor trailer cabin

At 2:32 p.m. on January 21, 2022, an employee was preparing to deliver diesel into a storage tank. The employee, a truck driver, was found sitting and leaning sideways (right) inside the cabin of a tractor truck not breathing/unconscious. The employee died due to respiratory/cardiac arrest.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(a)(2) · Respiratory protection
Other-than-serious$9,324$1,000Jun 22, 2022Final
Citation 1, item 2
29 CFR 1910.1200(h)(1) · Hazard communication
Other-than-serious$5,594$1,000Jun 22, 2022Final

Inspection 345683791 OPENED DEC 7, 2021Closed

Planned · Complete · Safety · 1,486 employees at the site · Closed Jun 1, 2022

18 Miles Nw Direction From Pecos, Pecos, TX 79772 · Specialized Freight (except Used Goods) Trucking, Local · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Other-than-serious$10,360$5,000Mar 30, 2022Final

Inspection 345686109 OPENED DEC 7, 2021Closed

Planned · Complete · Safety · 1,486 employees at the site · Closed Mar 29, 2022

4 Miles Sw Direction From Mentone Well # 4h, Pecos, TX 79772 · Support Activities for Oil and Gas Operations · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.304(g)(5)

(5) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent, continuous, and effective.

Other support activities for oil and gas operations employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.