OSHA SearchOSHA records by employer

Power Media, Inc.: OSHA inspections and violations

Akron, Ohio · Printing · NAICS 323119

1inspections
19citation items
$11,824current penalties
Apr 10, 2018last inspection

Power Media, Inc. has one OSHA inspection on record in Ohio.

OSHA opened it on Apr 10, 2018 after a complaint, in Akron.

From that inspection OSHA issued 19 citation items: 15 serious and 4 other-than-serious.

OSHA proposed $29,560 in penalties. After settlements and reviews the total is $11,824, down 60%.

Most often, OSHA cited 1910.107, spray painting and finishing (7 items).

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Power Media, Inc. averages $11,824 over 1 cited inspection in that time.

Power Media, Inc.: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

260employers cited

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Power Media, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343075008 OPENED APR 10, 2018Closed

Complaint · Partial · Health · 12 employees at the site · Closed Oct 21, 2022

546 Grant St., Akron, OH 44311 · Printing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.107(b)(1) · Spray painting and finishing
Serious$2,956$2,956Sep 4, 2018Final
Citation 1, item 1b
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Serious$2,956$0Sep 4, 2018Final
Citation 1, item 1c
29 CFR 1910.107(b)(5)(iv) · Spray painting and finishing
Serious$2,956$0Sep 4, 2018Final
Citation 1, item 4
29 CFR 1910.107(c)(5) · Spray painting and finishing
Serious$2,956$1,478Sep 4, 2018Final
Citation 1, item 5a
29 CFR 1910.107(e)(2) · Spray painting and finishing
Serious$2,956$1,478Sep 4, 2018Final
Citation 1, item 5b
29 CFR 1910.107(e)(9) · Spray painting and finishing
Serious$2,956$0Sep 4, 2018Final
Citation 1, item 7a
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$2,217$1,108Sep 4, 2018Final
Citation 1, item 7b
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Sep 4, 2018Final
Citation 1, item 7c
29 CFR 1910.134(f)(2) · Respiratory protection
Serious$0$0Sep 4, 2018Final
Citation 1, item 8
29 CFR 1910.157(g)(2) · Portable fire extinguishers
Serious$2,956$1,478Sep 4, 2018Final
Citation 1, item 9
29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements
Serious$2,217$1,109Sep 4, 2018Final
Citation 1, item 10a
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$4,434$2,217Sep 4, 2018Final
Citation 1, item 10b
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Serious$0$0Sep 4, 2018Final
Citation 1, item 10c
29 CFR 1910.1200(g)(8) · Hazard communication
Serious$0$0Sep 4, 2018Final
Citation 1, item 10d
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$0$0Sep 4, 2018Final
Citation 2, item 1
29 CFR 1910.107(g)(7) · Spray painting and finishing
Other-than-serious$0$0Sep 4, 2018Final
Citation 2, item 2
29 CFR 1910.132(d)(1) · Personal protective equipment, general requirements
Other-than-serious$0$0Sep 4, 2018Final
Citation 2, item 3
29 CFR 1910.132(f)(1) · Personal protective equipment, general requirements
Other-than-serious$0$0Sep 4, 2018Final
Citation 2, item 4
29 CFR 1910.157(e)(2) · Portable fire extinguishers
Other-than-serious$0$0Sep 4, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(1)

(b) Spray booths—(1) Construction. Spray booths shall be substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying. Spray booths shall be designed to sweep air currents toward the exhaust outlet.

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1910.107(b)(5)(iv)

(iv) Space within the spray booth on the downstream and upstream sides of filters shall be protected with approved automatic sprinklers.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.157 · Portable fire extinguishers

29 CFR 1910.303 · Electrical equipment, general requirements

Other printing employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.