OSHA SearchOSHA records by employer

Precision Sheet Metal Inc: OSHA inspections and violations

Dowagiac, Michigan · Roofing Contractors · NAICS 238160

2inspections
8citation items
$840current penalties
Jul 19, 2018last inspection

Precision Sheet Metal Inc has 2 OSHA inspections on record in Michigan, the first in 2015.

OSHA's last visit started on Jul 19, 2018 as a planned inspection, in Edwardsburg.

Across those inspections OSHA issued 8 citation items: 4 serious and 4 other-than-serious.

OSHA proposed $1,200 in penalties. After settlements and reviews the total is $840, down 30%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Precision Sheet Metal Inc averages $420 over 2 cited inspections in that time.

Precision Sheet Metal Inc: OSHA citation items per year, 2015 to 2018
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

656employers cited

39 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Precision Sheet Metal Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343320164 OPENED JUL 19, 2018Closed

Planned · Complete · Safety · 11 employees at the site · Closed Jan 8, 2019

27350 Max Street, Edwardsburg, MI 49112 · Plate Work Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.12635(2)
Serious$600$600Sep 28, 2018Final
Citation 2, item 1a
29 CFR 408.13308(3)
Other-than-serious$0$0Sep 28, 2018Final
Citation 2, item 1b
29 CFR 408.13308(1)
Other-than-serious$0$0Sep 28, 2018Final
Citation 2, item 2
29 CFR 1910.107(b)(5)(i) · Spray painting and finishing
Other-than-serious$0$0Sep 28, 2018Final
Citation 2, item 3
29 CFR 408.12171(1)
Other-than-serious$0$0Sep 28, 2018Final

Inspection 340958818 OPENED OCT 1, 2015Closed

Planned · Complete · Safety · 2 employees at the site · Closed Nov 10, 2015

30000m-62 West, Dowagiac, MI 49047 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.41725(10)
Serious$200$80Oct 15, 2015Final
Citation 1, item 2
29 CFR 408.43214(1)
Serious$200$80Oct 15, 2015Final
Citation 1, item 3
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$200$80Oct 15, 2015Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.107 · Spray painting and finishing

29 CFR 1910.107(b)(5)(i)

(i) The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Electrostatic spraying operations may be conducted with an air velocity over the open face of the booth of not less than 60 linear feet per minute, or more, depending on the volume of the finishing material being applied and its flammability and explosion characteristics. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(10)

(10) Roofing work on Low-slope roofs. Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted.

Other roofing contractors employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.