OSHA SearchOSHA records by employer

Pro Slab Inc: OSHA inspections and violations

Bluffton, South Carolina · Poured Concrete Foundation and Structure Contractors · NAICS 238110

8inspections
12citation items
$6,350current penalties
Dec 9, 2015last inspection

OSHA has inspected Pro Slab Inc 8 times in South Carolina since 2003.

The latest one began on Dec 9, 2015 as a planned inspection, in Hilton Head Island.

Those inspections ended with 12 citation items: 9 serious and 3 other-than-serious.

Penalties were first proposed at $6,350 and still stand at $6,350.

Fall protection in construction comes up most often in these citations: 2 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Pro Slab Inc averages $875 (1 cited inspection).

Pro Slab Inc: OSHA citation items per year, 2003 to 2015
Citation items per year, by inspection date.

South Carolina · latest 90 days of OSHA records

43employers cited

Get notified the morning OSHA posts each new citation in South Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in South Carolina

Checking a subcontractor, a client or your own company? Watch Pro Slab Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341111599 OPENED DEC 9, 2015Closed

Planned · Complete · Safety · 16 employees at the site · Closed Jan 25, 2016

6400 Bluewater Drive, Hilton Head Island, SC 29925 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$875$875Jan 7, 2016Final

Inspection 317493203 OPENED MAR 26, 2014Closed

Planned · Complete · Safety · 5 employees at the site · Closed Sep 9, 2014

87 North Sea Pines Drive, Hilton Head Island, SC 29928 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$3,000$3,000May 5, 2014Closed

Inspection 317005148 OPENED APR 24, 2013Closed

Planned · Complete · Safety · 15 employees at the site · Closed Jun 5, 2013

75 Baylor Drive, Bluffton, SC 29910 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(2) · Tools—Hand and Power: general requirements
Serious$525$525May 24, 2013Closed
Citation 1, item 2
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$700$700May 24, 2013Closed

Inspection 335250783 OPENED JUL 10, 2012Closed

Follow-up · Partial · Health · 20 employees at the site · Closed Sep 18, 2012

Building 1172b, Bauer Street, Mcas, Beaufort, SC 29904 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 308330455 OPENED JAN 10, 2012Closed

Planned · Complete · Health · 15 employees at the site · Closed Jun 14, 2012

553-a Delalio Avenue, Mcas, Beaufort, SC 29904 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Apr 11, 2012Closed
Citation 1, item 1b
29 CFR 1910.1200(h)(2)(iii) · Hazard communication
Other-than-serious$0$0Apr 11, 2012Closed
Citation 1, item 2
29 CFR 1926.95(a) · Criteria for personal protective equipment
Other-than-serious$0$0Apr 11, 2012Closed

Inspection 312825706 OPENED MAR 18, 2009Closed

Planned · Complete · Safety · 6 employees at the site · Closed May 7, 2009

3039 Okatie Hwy, Bluffton, SC 29910 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$100$100Apr 16, 2009Closed

Inspection 309048189 OPENED JUN 8, 2005Closed

Planned · Partial · Safety · 11 employees at the site · Closed Jul 21, 2005

70 Ladys Island Drive, Beaufort, SC 29907 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$250$250Jun 22, 2005Closed

Inspection 306836958 OPENED DEC 16, 2003Closed

Planned · Partial · Safety · 5 employees at the site · Closed Mar 26, 2004

29 Plantation Park Dr., Bluffton, SC 29910 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.100(a) · Hard hats in construction
Serious$300$300Jan 22, 2004Closed
Citation 1, item 2
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$300$300Jan 22, 2004Closed
Citation 1, item 3
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$300$300Jan 22, 2004Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(h)(2)(iii)

(iii) The location and availability of the written hazard communication program, including the required list(s) of hazardous chemicals, and safety data sheets required by this section.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

29 CFR 1926.652 · Trench protection

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

29 CFR 1926.95 · Criteria for personal protective equipment

Other poured concrete foundation and structure contractors employers in South Carolina

Alert subscribers get notified of each newly cited employer in South Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.